| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC A 247 SECTOR 19 NOIDA G B NAGAR | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 CrRejected-Finance | ₹2.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 CrRejected-Finance | ₹2.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.3 CrRejected-Finance H 12 SECTOR DELTA II GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | G B NAGAR | UP | ₹2.3 Cr | L4 | Rejected-Finance L4 |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
24 Mar 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Resurfacing of 75.00mtr wide road (Road no-16) between sector 33 and 10YEIDA WC-03
2026_YEIDA_1122864_35
YEA/GM(PROJECT)/2026/480 DT-27/02/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,110
₹4.7 L
1 Jul 2026
12 Mar 2026
25 Mar 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in rough excavation banking ,earth in layers not exceeding 20cm in depth clods watering rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankment for roads flood bank marginal bank and guide bank or filling up ground depression as per (SOR) Lead up to 20km | 383.2 | Cum | 352.4 | ₹1,35,039.68 |
| 2 | Providing, laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechinal mix plant carriage of mix plant carrige of mixed material by tipper to site ,laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achive the desired density. ( i/c Royalty) | 15.65 | Cum | 4,356.3 | ₹68,176.1 |
| 3 | Cement concrete with 4cm gauge approved stone ballast ,coarse sand & cement in the proportion of 8:4:1 including supply of all material ,labour,tools & plants etc required for proper completion of the work UPPWD SOR /281/P-17 | 1.67 | Cum | 5,820 | ₹9,719.4 |
| 4 | Brick work with bricks of class designation-150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) SOR-20/6.1.2 | 14.59 | Cum | 4,950 | ₹72,220.5 |
| 5 | 12mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand) SOR-20/13.4.2/P-461 | 63.42 | Sqm | 164.8 | ₹10,451.62 |
| 6 | Providing and laying or near ground level factory made kerb stone of M-25 grade cement in position to the required line level and curvature jointed with cement mortar 1:3 (1 cement 3 coarse sand ) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required completed etc.as per direction of Engineer-in charage (length of finished kerb edging shall be measured for payment ).(Precast C.C kerb stone shall be approved by Engineer-in Charge). | 11.58 | Cum | 6,899.8 | ₹79,899.68 |
| 7 | White washing with lime to give an even shade. New work (three or more coats ) SOR -20/16.03/673/P-24 | 898.2 | Sqm | 16 | ₹14,371.2 |
| 8 | Tack Coat Providing and applying tack coat with bitumen VG-10 bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom..(AR) (most/503-9b) | 42,152 | Sqm | 12.2 | ₹5,14,254.4 |
| 9 | Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grade II (50 mm thick) VG-30 | 1,106.49 | Cum | 10,072.3 | ₹1,11,44,899.23 |
| 10 | Bituminous Concrete Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects Grade II (CRMB-55) | 843.04 | Cum | 11,640 | ₹98,12,985.6 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
35.pdf
Tender Documents • 1.36 MB
BOQ_2095221.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].