Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹8.3 L (4.00%)Admitted-Finance | ₹2.2 Cr+₹8.3 L (4.00%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹10.3 L (4.92%)Admitted-Finance | ₹2.2 Cr+₹10.3 L (4.92%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | AJIT KUMAR DWIVEDI L1 | M/S Saptsatee Construction L2 | M/s MAHABIR CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | B.1 :: FOUNDATION
Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material In Oridinary Soil Vide 11.1.1(I)
Upto 3 m depth | 819.9 | m3 | - | - | - |
| 2.00 | B.1 :: FOUNDATION
Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material In Oridinary Soil Vide 11.1.1(II)
3 m to 6 m depth | 918.13 | m3 | - | - | - |
| 3.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Vide 11.4 (V) RCC M25 | 380.24 | m3 | - | - | - |
| 4.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix PCC M15 (1:2.5:5) vide 11.4.II(I) | 39.32 | m3 | - | - | - |
| 5.00 | Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 vide 11.7 | 30.01 | ton | - | - | - |
| 6.00 | B.2 :: SUBSTRUCTURE
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
RCC M25 (Hight upto 5m ) Vide 12.5(IV) | 267.8 | m3 | - | - | - |
| 7.00 | B.2 :: SUBSTRUCTURE
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
RCC M25 (Hight 5m to 10m ) Vide 12.5(IV)
RCC M25 | 255.24 | m3 | - | - | - |
| 8.00 | Reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 120213.5 G (P) (I) Case 1 12.5(IV)
RCC M30 Padestal | 2.46 | m3 | - | - | - |
| 9.00 | Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 vide 12.6 | 76.28 | ton | - | - | - |
| 10.00 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204 Vide 12.9 | 246 | Each | - | - | - |
Tender Value
₹2.1 Cr
EMD Value
₹5.1 L
Closing Date
5 Nov 2019, 1:00 pmClosed
CHIEF ENGINEER, JSRRDA, RANCHI
FFP BUILDING, 3RD FLOOR, DHURWA, RANCHI-834004
Construction and Maintenance of Bridge
2019_CEJHR_83549_1
JH11TKE-005B
Open Tender
Civil Works - Bridge Construction
Item Rate
545 days
HAZARIBAGH
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
CHIEF ENGINEER, JSRRDA
₹5.1 L
Yes
17 Jan 2020
31 Oct 2019
7 Nov 2019
31 Oct 2019
5 Nov 2019
31 Oct 2019
Amount
B.1 :: FOUNDATION Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material In Oridinary Soil Vide 11.1.1(I) Upto 3 m depth
B.1 :: FOUNDATION Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material In Oridinary Soil Vide 11.1.1(II) 3 m to 6 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Vide 11.4 (V) RCC M25
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix PCC M15 (1:2.5:5) vide 11.4.II(I)
Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 vide 11.7
B.2 :: SUBSTRUCTURE Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 (Hight upto 5m ) Vide 12.5(IV)
B.2 :: SUBSTRUCTURE Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 (Hight 5m to 10m ) Vide 12.5(IV) RCC M25
Reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 120213.5 G (P) (I) Case 1 12.5(IV) RCC M30 Padestal
Supplying, fitting and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 vide 12.6
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204 Vide 12.9
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material Vide 12.10 (I)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Sandy material Vide 12.10 (I)
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. Vide 13.14
B.3 :: SUPERSTRUCTURE Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5RCC Grade M 25 (Height above 10m) Vide 13.1(II)®
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 vide 13.2
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 With reinforcement.
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 vide 13.6
Drainage Spouts complete as per drawing and Technical specification vide 14.9
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 vide 13.11(I)
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification Vide 13.12
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.) vide 14.22
B.4 :: RIVER TRAINING AND PROTECTION WORKS Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder Vide 14.5(I)
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 vide 14.2
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 vide 14.11
Guard Wall 100 M (25m*4 sides) Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 including setting out,construction of shorting and bracing, removal of stumps and other deleterious Vide 11.1(I)(i)
Providing and laying PCC M-150 with nominal mix of (1:2:4) on top of guard wall with graded coarse aggregate all complete job as per specification and direction of E/I. Vide 11.4(II)(i)
Stone masonry in cement mortar (1:4) random rubble masonry for foundation complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 vide 11.6(III)(ii)
Stone masonry in cement mortar (1:4) random rubble masonry for Sub-Structure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Vide 12.4(III)(ii)
Providing and laying PCC M-20 with nominal mix of (1:2:4) on wall with graded coarse aggregate all complete job as per specification and direction of E/I.
Providing granular filter media etc all complete as per specification and direction of E/I Vide 12.11
B.5 :: APPROACH ROAD Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means In area of non thorning Jungle. Vide 2.2(i)(A)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 vide 3.4E
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For grading- II Material Vide 4.1A(ii)
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502. Vide 5.1(iii)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. WBM Grading 2 By Manual Means Vide 4.7.2(A)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. WBM Grading 3 By Manual Means Vide 4.7.3
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Bitumen (S-65) vide 5.9 Case-1 (II) Manual means
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503. Vide 5.2(IV)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C, S-65 as per Technical Specification Clause 510 Vide 5.12A Case-3 (ii)
B.6 :: MISCELLANEOUS. Confirmatory Boring NSR: Execustion and others as per the direction of Engineer in charge during the construction.
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1. as per 10.16
PMGSY Logo (Semi reflective sign ) Upto 0.9 Sq. m. …… as per the direction of Engineer in Charge vide SOR 10.3B
Boundary Pillar Reinforced cement concrtet M15 grade boundary pillars/local stone of standard design as per IRC 25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical specification Clause 1704 vide 10.11
Painting Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered/concrete surfaces as per drawing and Technical specification Clause 1701
MAINTANANCE For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Labour Cess @ 1%
M/S Saptsatee Construction
M/s MAHABIR CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_148985.xls
BOQ • 0.31 MB
JH11TKE-005B.pdf
Tender Documents • 2.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .