| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 CrAccepted-AOC D NO 58 21 50 BUTCHIRAJUPALEM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | ₹10.3 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹10.3 Cr+₹23,587 (0.02%)Rejected-Finance 4 195 38 PARAMESHWARA NILAYA MARAKADA KUNJATHBAIL DAKSHINA KANNADA KARNATAKA 575014 UDYAM KR 11 0021217 | DAKSHINA KANNADA | KARNATAKA | 575014 | ₹10.3 Cr+₹23,587 (0.02%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹10.5 Cr+₹22.3 L (2.16%)Rejected-Finance FLAT NO 03 PANCHAVATI BUILDING ADARSH NAGAR CHICALIM GOA 403711 | SOUTH GOA | GOA | 403711 | ₹10.5 Cr+₹22.3 L (2.16%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹11.7 Cr+₹1.4 Cr (13.6%)Rejected-Finance | ₹11.7 Cr+₹1.4 Cr (13.6%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹14.2 Cr+₹3.9 Cr (37.4%)Rejected-Finance ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | ₹14.2 Cr+₹3.9 Cr (37.4%) | L5 | Rejected-Finance Not Lowest |
Tender Value
₹10.7 Cr
EMD Value
₹8.6 L
Closing Date
2 Jun 2025, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD PICKET OPP JUBILEE BUS STATION SECUNDERABAD 500003
PROVISION OF NEW BUILDING FOR RND EQUIPMENT AND TEST FACILITIES UNDER HTCC AT RCI, HYDERABAD
2025_MES_704728_1
84032
Open Tender
Civil Works
Lump-sum
450 days
RCI Hyderabad
Class S
category a (i)
8 documents required · 8 mandatory
₹3,000
GARRISON ENGINEER I RND RCI HYDERABAD
₹8.6 L
Yes
30 Jul 2025
19 Apr 2025
4 Jun 2025
19 Apr 2025
2 Jun 2025
26 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I (BUILDINGS AND STRUCTURES) This Schedule (contains under mentioned Sl item No. 1.01) is not prepriced by MES and the prepriced rate indicated in Col - 5 as ₹0.00 indicates this fact only. The tenderer is required to quote their rates in Col 6. | |||||
| 1.01 | Lumpsum price worked out by the contractor for Construction of New Building New Building for R&D Equipment and Test Facility Bldg with RCC framed structure of height 4.50 mtr with RCC framed structure, Design mix M-25 grade concrete complete all as specified and shown on drawings. | 1 | SQUARE METRE | - | - |
| 1.02 | Lumpsum price worked out by the contractor for Construction of Hangar 1 (Dynamometer, Furnaces, Moulding Press, etc) Bldg with RCC framed structure of height 9.00 mtr with RCC framed structure, Design mix M-25 grade complete all as specified and shown on drawings. | 1 | SQUARE METRE | - | - |
| 1.03 | Lumpsum price worked out by the contractor for Construction of Parking shed (Garrage) with RCC framed structure of height 3.20 mtr with RCC framed structure, Design mix M-25 grade complete all as specified and shown on drawings. | 1 | SQUARE METRE | - | - |
| - | Lump sum price worked out by the Contractor for “SITE CLEARANCE AND DEVELOPMENT INCLUDING DEMOLITION" as listed in Schedule ‘A’ Part - II representing ___________% ________________________ percent Above / Below the lump sum price of `12,83,498.31 inserted by the MES in Schedule ‘A’ Part - II | 1 | JOB | 12,83,498.31 | ₹12,83,498.31 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - IV representing ____% ____________ percent Above / Below the lump sum price of ₹93,944.45 inserted by the MES in Schedule ‘A’ Part - IV | 1 | JOB | 93,944.45 | ₹93,944.45 |
| - | Lump sum price worked out by the Contractor for “ROADS / PATH / CULVERT” as listed in Schedule ‘A’ Part - V representing ________ % ____________ percent Above / Below the lump sum price of ₹19,61,497.31 inserted by the MES in Schedule ‘A’ Part - V | 1 | JOB | 19,61,497.31 | ₹19,61,497.31 |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - VI representing ______ % _______________ percent Above / below the lump sum price of ₹4,60,021.40 inserted by the MES in Schedule ‘A’ Part - VI | 1 | JOB | 4,60,021.4 | ₹4,60,021.4 |
| - | Lump sum price worked out by the Contractor for “STROM WATER DRAIN (AREA DRAINAGE)” as listed in Schedule ‘A’ Part - VII representing ____________% _________________________ percent Above / Below the lump sum price of `16,64,051.15 inserted by the MES in Schedule ‘A’ Part - VII | 1 | JOB | 16,64,051.15 | ₹16,64,051.15 |
| - | Lump sum price worked out by the Contractor for “FENCING / COMPOUND WALL / GATE” as listed in Schedule ‘A’ Part - VIII representing _________% ________________________ percent Above / Below the lump sum price of `35,89,747.61 inserted by the MES in Schedule ‘A’ Part - VIII | 1 | JOB | 35,89,747.61 | ₹35,89,747.61 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_789371.xls
BOQ • 0.70 MB
168588089.pdf
Tender Documents • 0.51 MB
168588091.html
Tender Documents • 0.06 MB
170706981.pdf
Tender Documents • 0.18 MB
171210482.rar
Tender Documents • 1.83 MB
84032Tender.pdf
Tender Documents • 1.98 MB
Drawings.rar
Tender Documents • 13.32 MB
PrepricedSchedules84032.pdf
Tender Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .