Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.9 L+₹4,017.52 (0.41%)Rejected-AOC KOTTOOR UNION | KOTTAYAM | KERALA | 686001 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.Murugaiyan L2 | Tmt.Akila L1 |
|---|---|---|---|---|---|
| 1.001. Construction of Retaning Wall at Puthagaram Pillaiyar Kovil Kulam in Kummattithidal Panchayat. | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 50.82 | Cum | 263.8 ₹13,406.32 | 263 ₹13,365.66 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 3.47 | Cum | 2,735.32 ₹9,491.56 | 2,735 ₹9,490.45 Lowest |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 6.93 | cum | 6,745.31 ₹46,745 | 6,745 ₹46,742.85 Lowest |
| 5.00 | Cement Concrete 1:3:6 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. | 94.54 | cum | 7,049.03 ₹6,66,415.3 | 7,049 ₹6,66,412.46 Lowest |
| 6.00 | Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete | 180.81 | Sqm | 549.5 ₹99,355.1 | 545 ₹98,541.45 Lowest |
| 7.00 | Providing and fixing 20mm Bitumen Felt for Expansion Joint Between Dirtwall & Deck Slab | 10.08 | Sqm | 225.88 ₹2,276.87 | 222 ₹2,237.76 Lowest |
| 8.00 | Providing and fixing Weep Hole cc masonry work for Retaining wall including cost and Conveyance of all Materials to site | 10 | Nos | 192.5 ₹1,925 | 192 ₹1,920 Lowest |
| 9.00 | Provision for Name Board Charges | 1 | Nos | 3,500 ₹3,500 | 1,000 ₹1,000 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,51,761 ₹1,51,761 | 1,51,148 ₹1,51,148 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
30 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(B.pt),Kottur Block.
Block Development Officer(B.pt),Kottur Block.
1. Construction of Retaning Wall at Puthagaram Pillaiyar Kovil Kulam in Kumattithidal Panchayat MLACDS 2025 26 Kottur Block Tiruvarur Dist Package No 2
2025_RDTN_608278_1
RC No 1630/2025/a2 Date 22 09 2025 Kottur block Kummattithidal pt P2
Open Tender
Civil Works - Others
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹10,000
Yes
12 Nov 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
30 Sept 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .