Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹56.3 LAccepted-AOC 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICAION 124103 | JHAJJAR | HARYANA | 124103 | L-1 | Accepted-AOC ok | |
| 2 | Not Admitted-Fee/PreQual/Technical 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | - | Not Admitted-Fee/PreQual/Technical Others-Agency has been found non-responsive for non submission of Eligibility criteria document Performa for Operation and Maintenance, copy of final bill of O&M. These documents were mandatory as per CBD clause 39. | |
| 3 | Not Admitted-Fee/PreQual/Technical 464 21 NEW ANAJ MANDI TOHANA 125120 | FATEHABAD | HARYANA | 125120 | - | Not Admitted-Fee/PreQual/Technical Others-Agency has been found non-responsive for non submission of Eligibility criteria document Performa for O&M, copy of final bill of O&M & similar nature work experience. These documents were mandatory as per CBD clause 39 & clause 4.5 (a) (ii) |
| Sl No | Description | Qty | Unit | Chahar Construction Co L1 |
|---|---|---|---|---|
| 1.00 | Operation and Maintenance of Water Supply Scheme Dhakla . Including Rising Main, including all installation pumping machinery, electric installation, street light, chlorination system and all other installation including existing distribution system and rising main for
1st year (12 months from the date of commencement).(Excluding repair of civil structure and Disinfectant). | 1 | Job | 18,70,000 ₹18,70,000 Lowest |
| 2.00 | OandM Dhakla 2nd year | 1 | Job | 18,90,000 ₹18,90,000 Lowest |
| 3.00 | OandM Dhakla 3rd year | 1 | Job | 19,02,200 ₹19,02,200 Lowest |
Tender Value
₹57.8 L
EMD Value
₹1.2 L
Closing Date
18 Aug 2025, 1:00 pmClosed
ASHWANI SANGWAN
Jhajjar PHED No. 2
Operation and Maintenance of water supply scheme Dhakla for the next 3 years
2025_HRY_464467_1
20255A6F66D1 97B8 4283 B3B8 F754CF514A72591PUH
Open Tender
Civil Works
Works
1095 days
DHAKLA
3 documents required · 3 mandatory
₹5,000
₹1.2 L
Yes
8 Oct 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
Amount
Operation and Maintenance of Water Supply Scheme Dhakla . Including Rising Main, including all installation pumping machinery, electric installation, street light, chlorination system and all other installation including existing distribution system and rising main for 1st year (12 months from the date of commencement).(Excluding repair of civil structure and Disinfectant).
OandM Dhakla 2nd year
OandM Dhakla 3rd year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .