Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
29 Jul 2026, 12:00 pm3d left
Executive Engineer
Executive Engineer PWD R B Division JMC
Providing and laying of Tile and drain in Ram leela Ground and other allied works in ward no 51 Jammu
2026_HAUDD_316073_1
PWD(RB)DIV/JMC/32 of 2026 Dated 20-03-2026
Open Tender
Civil Works
Percentage
120 days
ward no 51
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Chief Account Officer JMC
₹42,000
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 0.36 | Cum | 1,725.2 | ₹621.07 |
| 2 | Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: | 0.54 | Cum | 2,516.85 | ₹1,359.1 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge all kinds of soil. | 9 | Cum | 479.3 | ₹4,313.7 |
| 4 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 1,120 | sqm | 91.75 | ₹1,02,760 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 10.35 | Cum | 5,733.6 | ₹59,342.76 |
| 6 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5coarse sand : 10graded stone aggregate 40 mm nominal size) | 86 | Cum | 4,826.5 | ₹4,15,079 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | 20.5 | Sqm | 286.35 | ₹5,870.18 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 4.8 | Cum | 7,788.4 | ₹37,384.32 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 400 | kg | 123.2 | ₹49,280 |
| 10 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 400 | kg | 181.6 | ₹72,640 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1028803.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].