Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC VIJAYAKUM AR | ₹8.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.3 L+₹3,054.62 (0.37%)Rejected-AOC | ₹8.3 L+₹3,054.62 (0.37%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | A VIJAYAKUMAR L1 | V RAJAGOPAL L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils with initial lead and lift excepting all kinds of rock dumping the excavated materials away from work site manually within 50m initial lead and initial lift etc. complete as per direction of departmental officers. | 76.83 | m3 | 90 ₹6,914.43 Lowest | 90.6 ₹6,960.53 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 76.83 | m3 | 2,180 ₹1,67,482.86 Lowest | 2,185 ₹1,67,867 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 507.5 | m2 | 85 ₹43,137.5 Lowest | 87 ₹44,152.5 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 507.5 | m2 | 19 ₹9,642.5 Lowest | 20 ₹10,150 |
| 5.00 | Providing and laying of 50mm compacted thick plastic Dense Bituminous Macadam using 0.24cum of 26.5013.20mm,0.25 cum of13.2036mm and0.23 cum of of 2.36mm &belowandwith 47.88kgs, of VG30/VG40bitumen, 5.32kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP siteheating the bitumen and aggregates to required temperature and mixing the min required incentral hotmixplant2030tonnes capcity conveying the mixby tippertrucks to powersite spreadingt he mix to Uniformthickness of 50mm withpaverto the specifiedgrades and crosssection and compacted by Vibratory/Pnuematicrollert otherequired densityetc.,including labour for attending to paveratsite etc., including hirechrages and fuelcharges for 2030TCMP with twobitumenboiler ,tippertrucks, paverfinisher/9mPaverfinisher, Vibratory/Pnuematicrollers and all othertoolsand plantrequired including all othe rincidental charges etc., completed as per specification using cmp clause 504 of MORTH Rev -5 | 26.28 | m3 | 10,390 ₹2,73,038.81 Lowest | 10,398 ₹2,73,249.04 |
| 6.00 | Providing and laying Tack coat 2 Kg over BT Surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 424.58 | m2 | 28 ₹11,888.24 Lowest | 29 ₹12,312.82 |
| 7.00 | Providing and laying Plastic bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG30/ VG70 bitumen,5.03 Kg of plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 28.2 | m3 | 10,700 ₹3,01,763.54 Lowest | 10,705 ₹3,01,904.55 |
| 8.00 | Conveyance of Surplus earth from work site to City outer with average lead of 15 km | 65.21 | m3 | 200 ₹13,042.94 Lowest | 205 ₹13,369.01 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
19 Mar 2025, 3:00 pmClosed
Assistant commissioner, westzone
westzone, coimbatore corporation
Providing of BT patches at Ramakrishnapuram , Edyar Street , Gopal Layout Cross Road and Ward areas in Ward No 73 of West Zone.
2025_MAWS_531810_37
E7/WESTZONE/2025
Open Tender
Civil Works
Works
90 days
westzone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹10,000
11 May 2026
14 Mar 2025
20 Mar 2025
14 Mar 2025
19 Mar 2025
14 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
Road.pdf
Tender Documents • 0.68 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_633702.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .