Loading…
Loading…
Tender Value
₹4.0 L
EMD Value
₹7,908
Closing Date
9 Sept 2026, 2:00 pm
Executive Engineer
Executive Engineer University works Department
Construction of shed for servo of Dhanvantri library by way of demolishing the existing shed at New University Campus
2026_UDJK_322558_1
enit 228 dated 24-8-26
Open Tender
Civil Works
Percentage
60 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
Executive Engineer University works Department
₹7,908
27 Aug 2026
27 Aug 2026
11 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar. | 13.49 | Cum | 1,458.45 | ₹19,674.49 |
| 2 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar. | 3.64 | Nos | 4,944.1 | ₹17,996.52 |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 1.13 | Cum | 2,516.85 | ₹2,844.04 |
| 4 | Engage Second Class Plumber for shifting pump/motor. | 5 | per day | 734 | ₹3,670 |
| 5 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : G.S. Sheet. | 16.73 | Sqm | 125.35 | ₹2,097.11 |
| 6 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. | 900 | Kgs | 4.3 | ₹3,870 |
| 7 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 9.66 | Cum | 592.9 | ₹5,727.41 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 7.47 | Cum | 4,826.5 | ₹36,053.96 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 13.59 | Cum | 5,733.6 | ₹77,919.62 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 34.39 | Sqm | 628.95 | ₹21,629.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1082297.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].