Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance | ₹2.5 L | 1 | Accepted-Finance Lower Bidder |
| 2 | 2₹2.5 LRejected-Finance | ₹2.5 L | 2 | Rejected-Finance Higher Bidder |
| Sl No | Description | Qty | Unit | V K S PRABHAKARAN L1 | BKS GROUPS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock including Cost conveance and labour charges ect, completd. | 33.66 | cum | 263.5 ₹8,869.41 | 350 ₹11,781 |
| 2.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.74 | cum | 5,344.5 ₹19,988.43 | 5,500 ₹20,570 |
| 3.00 | Supplying and erecting centering for sides and soffits including all other charges etc. complete. UPTO GROUND LEVEL | 45.84 | sqm | 547.2 ₹25,083.65 | 600 ₹27,504 |
| 4.00 | Supplying and erecting centering for sides and soffits including all other charges etc. complete. ABOVE GROUND LEVEL | 17.6 | sqm | 1,095 ₹19,272 | 1,100 ₹19,360 |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including Cost conveance and labour charges ect, completd. | 11.81 | cum | 5,614.5 ₹66,307.25 | 5,615 ₹66,313.15 |
| 6.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, including Cost conveance and labour charges ect, completd. | 3.2 | cum | 9,066.2 ₹29,011.84 | 9,067 ₹29,014.4 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete | 0.28 | cum | 91,858.2 ₹25,874.62 | 91,858.2 ₹25,874.62 |
| 8.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., including Cost conveance and labour charges ect, completd, | 2.15 | cum | 6,635.5 ₹14,266.32 | 6,635.5 ₹14,266.32 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 37,561.23 ₹37,561.23 | 38,643.03 ₹38,643.03 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
19 Jan 2026, 3:00 pmClosed
Panchayat President
Panchayat Office, Aminjikarai
Providing Cross Drainage in Aminjikarai Colony at Aminjikarai Panchayat in Thirukazhukundram Panchayat Union
2026_RDTN_640802_1
3590/2025/A6
Open Tender
Civil Works
180 days
Aminjikarai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
30 Jun 2026
8 Jan 2026
19 Jan 2026
8 Jan 2026
19 Jan 2026
8 Jan 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock including Cost conveance and labour charges ect, completd.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including all other charges etc. complete. UPTO GROUND LEVEL
Supplying and erecting centering for sides and soffits including all other charges etc. complete. ABOVE GROUND LEVEL
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including Cost conveance and labour charges ect, completd.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, including Cost conveance and labour charges ect, completd.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., including Cost conveance and labour charges ect, completd,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_767413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Techbid.pdf
Tender Documents • 0.41 MB
BOQ_767413.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid