| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹48.0 LAccepted-AOC | ₹48.0 L | 1 | Accepted-AOC Below than estimate rate |
| 2 | 2₹48.1 LRejected-AOC | ₹48.1 L | 2 | Rejected-AOC Above than estimate rate |
| Sl No | Description | Qty | Unit | velmurugan.s L1 | K R BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Strengthening of Kalathuparaipatty road km 0/0 - 1/4 (R60) Estimate amount : Rs. 52.00 Lakhs | |||||
| 2.00A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0 - 2/6 | 2,352 | Sqm | 6 ₹14,112 Lowest | 6.5 ₹15,288 |
| 4.00Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A | |||||
| 5.00 | Km 0/0 - 2/6 | 945 | Cum | 140 ₹1,32,300 Lowest | 140.5 ₹1,32,772.5 |
| 6.00Picking of Old Wornout BT Surface including all cost etc complete | |||||
| 7.00 | Km 0/0 - 2/6 | 1,760.42 | Cum | 23.3 ₹41,017.79 Lowest | 23.5 ₹41,369.87 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0 - 2/6 | 660.15 | Cum | 2,476 ₹16,34,531.4 Lowest | 2,476.5 ₹16,34,861.47 |
| 10.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
Tender Value
Refer Docs
EMD Value
₹52,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Block Development Officer(BP)
Panchayat Union Office Vedasandur
Strengthening of Kalathuparaipatty road km 0/0 - 1/4 (R60) TN-05-14-01 (SFC)
2026_RDTN_660414_1
316/2026/A3
Open Tender
Civil Works
Item Wise
180 days
Vedasandur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹52,000
10 Mar 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Name of the work : 1. Strengthening of Kalathuparaipatty road km 0/0 - 1/4 (R60) Estimate amount : Rs. 52.00 Lakhs
A. Construction work Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A
Picking of Old Wornout BT Surface including all cost etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Supply and Fixing of KM Stone
Supply and Fixing of HM Stone
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 0.39 MB
Tendernotice_3.pdf
PDF • 1.11 MB
BOQ_792379.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].