| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.8 LAccepted-AOC HIMACHAL PRADESH HP | ₹86.8 L Quoted ₹89.5 L | L1 | Accepted-AOC L1 Lowest bidder |
| 2 | L2₹1.1 Cr+₹20.6 L (23.0%)Rejected-Finance | ₹1.1 Cr+₹20.6 L (23.0%) | L2 | Rejected-Finance other then lowest bidder |
| 3 | L3₹1.0 Cr+₹13.7 L (15.3%)Rejected-Finance | ₹1.0 Cr+₹13.7 L (15.3%) | L3 | Rejected-Finance other then lowest bidder |
| 4 | L4₹1.0 Cr+₹15.0 L (16.8%)Rejected-Finance BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | ₹1.0 Cr+₹15.0 L (16.8%) | L4 | Rejected-Finance other then lowest bidder |
| Sl No | Description | Qty | Unit | Sandeep Kumar L3 | Ajay Kumar L1 | Jagdish Chander Thakur L2 | P C Construction L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kind of soil such as pick work,jumper work, blasting work in hard & soft rock and chiesaling work including slushy soil & under flooring water up to all excavated soil up to any lead & lifts from the edge of excavation and then depth and stacking the returning the stacked soil in 15 CM ( fifteen centimetres) layer's when required in to plinth sides of foundation etc. Consolidation each diposited layer by ramming & watering & then disposing of all surplus excavated earth as directed with in all lead of 20 meters in Chiselling /wedging out of rock complete in all respect in trench weir, sump well, anchor blocks, presedimentation tank steel bridge, check dam, site development works etc. | 203.91 | Cum | 465 ₹94,818.15 | 340 ₹69,329.4 Lowest | 465 ₹94,818.15 | 516 ₹1,05,217.56 |
| 2.00 | Providing and laying cement concrete 1:3:6 ( One cement : three sand: six graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charges. | 36.36 | Cum | 8,890 ₹3,23,240.4 Lowest | 8,990 ₹3,26,876.4 | 9,465 ₹3,44,147.4 | 9,526 ₹3,46,365.36 |
| 3.00 | Providing and laying cement concrete 1 : 1. 5 : 3 ( One cement : one & half sand: three graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- Foundation ,footing bases of column and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charges. | 25.41 | Cum | 13,750 ₹3,49,387.5 | 9,300 ₹2,36,313 Lowest | 14,065 ₹3,57,391.65 | 14,152 ₹3,59,602.32 |
| 3.10 | In walls ( any thickness but not less than 0.10 metre thickness) attached pillasters, buttresses plinth and string cources etc. from top of foundationlevel up to floor two level within all leads and lifts as per the direction of Engineer-in-Charges. | 47.71 | Cum | 13,750 ₹6,56,012.5 | 9,280 ₹4,42,748.8 Lowest | 14,165 ₹6,75,812.15 | 14,167 ₹6,75,907.57 |
| 4.00 | Providing form work with steel plates 3.15 milimetre thick welding with angle iron in frame 30x30x5 milimetre so as to give fair finish including centering, shuttering and propping etc. with wooden battens and ballies, height of propping and centring below floor to ceiling not exceeding four metres and removal of the same for in-situ-reinforced concrete and plain concrete work in:- Flat surface such as soffits of suspended floors, roofs, landing and the like floor etc. up to 200 milimetres in thickness including all leads and lifts as per the direction of Engineer -in- Charge. | 31.21 | Sqm | 590 ₹18,413.9 | 396 ₹12,359.16 Lowest | 565 ₹17,633.65 | 607 ₹18,944.47 |
| 4.10 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge. | 528.48 | Sqm | 365 ₹1,92,895.2 | 316 ₹1,66,999.68 Lowest | 365 ₹1,92,895.2 | 382 ₹2,01,879.36 |
| 5.00 | Providing mild / tor steel reinforcement for reinforced concrete work including bending, binding and placing in position complete up to floor two level including within all leads and lifts as per direction of Engineer -in- Charge. | 5,408.8 | kg | 78 ₹4,21,886.4 | 74 ₹4,00,251.2 Lowest | 78.65 ₹4,25,402.12 | 78 ₹4,21,886.4 |
| 6.00 | P/L cement concrete work 1:2:4(1cement:2sand:4graded stone aggregate 20mm nominal size)and curing complet excluding the cost of form work and reinforcemnet work,in suspended floor,roofs,landing and shelves and their support Balconies,Beams,girders,bressumers and contilevers upto floor two level as per the direction and entire satisfaction of Engineer-in-Charge. | 4.64 | Cum | 12,500 ₹58,000 | 9,600 ₹44,544 Lowest | 13,465 ₹62,477.6 | 13,664 ₹63,400.96 |
| 7.00 | Providing and laying cement concrete 1:5:10 mix (One cement :five sand : ten stone aggregate 40mm nominal size) and curing complete excluding the cost of form work for plain /reinforced concrete in R/wall &B/wall the size of plum should be 150mm to 300mm as per drawing and HPPWD technical specification. | 6.12 | Cum | 7,960 ₹48,715.2 | 6,250 ₹38,250 Lowest | 8,165 ₹49,969.8 | 8,220 ₹50,306.4 |
| 8.00 | Laying, Jointing in trenches galvanized mild steel tubes including fittings complete (earth work in trenches to be measured and paid for separately) including complete fitting and as per the direction of the Engineer-in-charge with in all leads and lifts of the following nominal bores:. 80mm dia | 12 | Rmt. | 72 ₹864 | 65 ₹780 Lowest | 65 ₹780 Lowest | 74 ₹888 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
30 Mar 2021, 5:00 pmClosed
EE JS Division Salooni
Executive Engineer JS Division Salooni
Sh Nallah head weir check dam at source const of intake RCC BP Tank const of Raw water tank const of slow sand filter const of sed tank const of RCC main storage tank and sub main storage tank ELJ and testing of GI Pipes of various dia
2021_HPIPH_45581_1
No-EE-JSD-SLN-10313-10361 dt 15.03.2021
Open Tender
Civil Works - Water Works
Item Rate
365 days
EE JS Division Salooni
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
₹1.4 L
Yes
22 Jul 2026
16 Mar 2021
31 Mar 2021
17 Mar 2021
30 Mar 2021
17 Mar 2021
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .