| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹67.8 LAccepted-AOC | L-I | Accepted-AOC Bidder quoted lowest amount hence awarded | |
| 2 | L-II₹71.6 LRejected-Finance | L-II | Rejected-Finance Higher side bid |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
29 Mar 2022, 2:00 pmClosed
Sh. Munish Sahni, Deputy General Manager
RTDC, US, Club, Shimla-1
Construction of proposed Sky Walk from HP Sectt. Stairs to Ayurvedic Hospital (Stage-II) (SH C/o Steel Deck foot over bridge on RCC pillar from RD 0/115 to 0/500)
2022_RTDCH_58337_1
RTDC/Sky Walk/2021/9210 date 21/03/22
Open Tender
Construction Works
Item Rate
180 days
Chhota Shimla
Scanned copy of PAN/TAN scanned copy of similar nature of work done scanned copy of turn over scanned copy of proof of registration Read RFP
7 documents required · 7 mandatory
₹5,900
DEPUTY GENERAL MANAGER RTDC HP
₹5 L
Yes
23 Jan 2023
21 Mar 2022
29 Mar 2022
21 Mar 2022
29 Mar 2022
21 Mar 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. : Ordinary rock as per direction of engineer-in-charge.
Providing and laying in position cement concrete of specified 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) grade excluding the cost of centering and shuttering - All work up to plinth level :as per direction of engineer-in charge.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work usingcomen content as per approved design mic, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of cencrete, improve workability without impairing strength and durability as per direction of Engineer-in-Charge. All works upto plinth level.
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work usingcomen content as per approved design mic, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of cencrete, improve workability without impairing strength and durability as per direction of Engineer-in-Charge. All works above plinth level upto floor V level.
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Foundation and footing
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Column & Beams and R/walls
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete level Hard drawn steel wire fabric as per direction of engineer-in charge.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.:Hot finished welded type tubes as per direction of engineer-in charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratting, frames, gurd bar and ladder railing etc.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In Base plate, chequered plate and anochor bolt etc.
Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately) as per direction of engineer-in charge.
Providing and fixing polycarbonate sheet of 5mm in Roofing including carriage of material upto all leads and lifts complete in all respects.
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.75 mm diameter
Designing, fabrication, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour andn shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium ble work gang saw cut (polished and machine cut) of items. The Contractor shall provide curtain wall withaluminium composite panel cladding, having all theperformance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium ble work gang saw cut (polished and machine cut) of items. The Contractor shall provide curtain wall withaluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium ble work gang saw cut (polished and machine cut) of items. The Contractor shall provide curtain wall withaluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.
Providing and laying imported PVC (Astro-Truff) of 6mm thickness, weight per sqm not less then 5Kg, tensile strength not less than 3.93MPA, breaking elongination not more than 115.9% and as per the directiontion and specification of Engineer-in-Charge
Piyush Gupta
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .