| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 CrAccepted-Finance | ₹26.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹26.8 CrAccepted-Finance BOMDILA AP | SHI YOMI | ARUNACHAL PRADESH | 791001 | ₹26.8 Cr | L2 | Accepted-Finance L2 |
| 3 | L3₹26.9 CrAccepted-Finance J HOUSE B 103 SOUTH CITY 1 SECT 30 NEAR SIGNATURE TOWN GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹26.9 Cr | L3 | Accepted-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| 5 | Rejected-Technical P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | - | - | Rejected-Technical Technically Non-Responsive |
Tender Value
₹25.7 Cr
EMD Value
₹51.4 L
Closing Date
15 Jan 2025, 3:00 pmClosed
General Manager (P)
General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
One Time Improvement at selected locations between Km 4.150 (Srikona) to km 32.450 (Malua) including Panchgram Sinking Zone of Silchar- Badarpur Section NH 37 (New) in the state of Assam in FY 24-25
2024_NHIDC_841382_1
RO/Sil/Sil-Bad/OTI /2024-25/2
Open Tender
Civil Works
120 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹51.4 L
NHIDCL, RO Guwahati
11 Mar 2025
24 Dec 2024
16 Jan 2025
24 Dec 2024
15 Jan 2025
24 Dec 2024
24 Dec 2024 - 30 Dec 2024
31 Dec 2024
Amount
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler (refer table 500-9 of MoRT&H specification) (III) with 30/40 or VG-40 grade Bitumen (msa>30) for Grading-II (13 mm nominal size)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (III) with 30/40 or VG-40 grade Bitumen (msa>30) for GradingII (19 mm nominal size)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(ii) With bitumen emulsion-CSS-1 ( IS-8887-2004 )
Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(I)With Bitumen emulsion CSS-1h
Profile Correction Layer of WMM Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
BT Dismantling Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means:Bituminous course
WMM Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.)
Road Marking 'Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications
Studs Providing and erecting Ministar Road studs b) Two- way reflective(with butyl adhesive) with dimensions : 68 x 34x9.8mm Plastic body with 2x8 glass elements.
Drain Excavation Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. '(II) With dewatering upto 3 m depth
Drain PCC-M15 'Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser 'PCC Grade M15
Drain-M-25 'Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. RCC Grade M25 'Case II: With Batching Plant, Transit Mixer and Concrete Pump
Drain Reinforcement Reinforcement in Foundation: Supplying, fitting and placing un-coated TMT bar reinforcement in foundation complete as per drawing and technical specifications (ii)Super Ductile (SD) TMT reinforcement bar of Fe-500 N/mm2
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (i) 90cm equilateral traingle
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (ii) 60cm equilateral traingle
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (iii) 60cm circular
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (iv) 80cmm x 60 cm rectangular
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (v) 60cmm x 45 cm rectangular
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (vi) 60cmm x 60 cm square
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (vii) 90cm high octagon
Panchgram Sinking Zone (RCC Retaining Wall + Pre Cast Culvert) -Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling withapproved material. Mechanical Means (upto 3mtr depth)
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Plain Cement Concrete (M-15) in Open Foundation complete as per Drawing and Technical Specifications.
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications.
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Reinforced cement concrete (M-30) in Sub-structure complete as per drawing and Technical Specifications
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Reinforced cement concrete (M-30) in Super-structure as per drawing and Technical Specification
Panchgram Sinking Zone- Reinforced cement concrete (M-35) in Crash Barrier as per drawing and Technical Specification
Panchgram Sinking Zone- Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Panchgram Sinking Zone- (RCC Retaining Wall + Pre Cast Culvert) Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and Technical Specifications
Panchgram Sinking Zone- Earthwork in SG Top Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land
Panchgram Sinking Zone- Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401 (with an initial lead of 5 Km.) (Including cost of testing of materials at site and laboratory as directed by the deptt.) for grading- II Material
Panchgram Sinking Zone- Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )
Panchgram Sinking Zone- Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(ii) With bitumen emulsion-CSS-1 ( IS-8887-2004 )
Panchgram Sinking Zone- Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(c) Granular surfaces treated with primer
Panchgram Sinking Zone- Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(II)With Bitumen emulsion CSS-1 (IS:8887-2004) ' (a) Normal bituminous surface
Panchgram Sinking Zone- Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoRT&H specification) (III) with 30/40 or VG-40 grade Bitumen (msa>30) for GradingII (19 mm nominal size)
Panchgram Sinking Zone- Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler (refer table 500-9 of MoRT&H specification) (III) with 30/40 or VG-40 grade Bitumen (msa>30) for Grading-II (13 mm nominal size)
Panchgram Sinking Zone- Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. )
Panchgram Sinking Zone- Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means Bituminous course
Panchgram Sinking Zone- Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.)
Panchgram Sinking Zone 'Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications
Panchgram Sinking Zone- Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.)
Panchgram Sinking Zone- Providing and erecting Ministar Road studs b) Two- way reflective(with butyl adhesive) with dimensions : 68 x 34x9.8mm Plastic body with 2x8 glass elements.
T.T.C. INFRA INDIA (BID ID -3155460)
J INFRATECH LIMITED (BID ID -3155498)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument.pdf
Tender Documents • 1.28 MB
Tenderdocument_2.pdf
Tender Documents • 0.04 MB
Tenderdocument_3.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid