Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AMTA BANGLOPARA AMTA HOWRAH 711401 | AMTA | HOWRAH | WEST BENGAL | 711401 | Accepted-Technical accepted |
| 2 | Accepted-Technical KASHYABPUR MAHISHREKHA P S ULUBERIA HOWRAH 711303 | HOWRAH | HOWRAH | WEST BENGAL | 711303 | Accepted-Technical accepted |
| 3 | Accepted-Technical KUIKOTA NEAR SHIBMANDIR MIDNAPUR MIDNAPUR W 721101 | MIDNAPUR | MIDNAPUR W | WEST BENGAL | 721101 | Accepted-Technical accepted |
| 4 | Accepted-Technical | Accepted-Technical accepted |
| 5 | Accepted-Technical NABGHAPA NH 6 ANKURHATI 711322 | ANKURHATI | HOWRAH | WEST BENGAL | 711322 | Accepted-Technical accepted |
Tender Value
Refer Docs
EMD Value
₹24,112
Closing Date
13 Nov 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Manager, Belda Division,WBSEDCL
Mahammadpur, Belda
Laying of 3 300 Sq.mm XLPE UG cable across the rail crossing and NH-12 crossing, and from the proposed new Punja 33/11 KV Sub-Station to the proposed overhead line before the NH crossing of the proposed new Ranisarai 11 KV feeder under Belda Divisio
2026_WBSED_1048392_1
BD/E-Tender/2026-27/1464
Open Tender
MISC ELECTRICAL WORKS
Lump-sum
90 days
Ranisarai Belda
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,112
Yes
18 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
13 Nov 2026
5 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | SURVEY OF HTUG LINE | 1 | KM | 3,000 | ₹3,000 |
| 1.02 | EXCAVATION OF SOIL FOR FORMATION OF TRIAL HOLE (101x0.5x1.2) AS PER INSTRUCTION OF SITE ENGINEER INCLUDING BACKFILLING OF EXCAVATED SOIL | 2.64 | CUM | 34 | ₹89.76 |
| 1.03 | EXCAVATION OF SOIL FOR FORMATION OF CABLE TRENCHES & RE-INSTATEMENT OF CABLE TRENCHES WITH EXCAVATED SOIL AS PER INSTRUCTION OF SITE ENGINEER (SINGLE CABLE) | 390 | CUM | 21 | ₹8,190 |
| 1.04 | SUPPLY OF KLIN-BURNT 1ST CLASS BRICKS HAVING PROPER SIZE & SHAPE SUITABLE FOR CABLE PROTECTIVE COVER AS PER INSTRUCTION OF SITE ENGINEER | 15,840 | NOS | 8.1 | ₹1,28,224.8 |
| 1.05 | LAYING OF BRICKS AS PER DRAWING AND INSTRUCTION OF SITE ENGINEER | 15,840 | NOS | 1.12 | ₹17,740.8 |
| 1.06 | LAYING AND DRESSING OF 11KV XLPE 300 SQ.MM CABLE IN THE EXCAVATED CABLE TRENCHES AS PER INSTRUCTION OF SITE ENGINEER | 1,496 | M | 62 | ₹92,752 |
| 1.07 | MICRO-TUNNELING WORK WITH LAYING OF HDPE PIPE 110 MM DIA, PE 80, PN 6 AS PER INSTRUCTION OF SITE ENGINEER AND AS PER SITE CONDITION INCLUDING LAYING OF UG CABLE AND SUPPLY OF HDPE PIPE AS PER IS:4984-1995 | 800 | M | 821.49 | ₹6,57,192 |
| 1.08 | MAKING & FIXING OF INDOOR/OUTDOOR TERMINATION JOINT FOR 11 KV XLPE 300 SQ.MM CABLE INCLUDING FIXING OF THE JOINTING BOX AT THE EXISTING STRUCTURE BUT WITHOUT THE JOINTING MATERIALS | 6 | NOS | 2,023 | ₹12,138 |
| 1.09 | MAKING OF STRAIGHT THROUGH JOINT INCLUDING MAKING OF JOINTING PIT OF 33 KV XLPE 400 SQ.MM CABLE WITHOUT SUPPLY OF JOINTING MATERIALS EXCLUDING MAKING OF "PROTECTION DUCT FOR CABLE JOINT" | 2 | NOS | 2,150 | ₹4,300 |
| 1.1 | MAKING PROTECTIVE DUCT FOR CABLE JOINT COMPLETE AS PER WBSEDCLs APPROVED DRAWING | 2 | NOS | 9,154 | ₹18,308 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2567052.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .