| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC | ₹25.5 L | L1 | Accepted-AOC AOC ISSUE |
| 2 | L2₹25.5 LSame as L1Rejected-Finance | ₹25.5 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
| 3 | L2₹25.5 LSame as L1Rejected-Finance | ₹25.5 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
| 4 | L2₹25.5 LSame as L1Rejected-Finance HOUSE NO 95 26 HALIM COMPOUND PEACHBAG KANPUR | KANPUR | UTTAR PRADESH | ₹25.5 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
| 5 | L2₹25.5 LSame as L1Rejected-Finance | ₹25.5 LSame as L1 | L2 | Rejected-Finance Rejected in lottery |
Tender Value
₹30.0 L
EMD Value
₹3.0 L
Closing Date
25 Feb 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer Office, KNN, Motijheel
Improvement of lanes and drain at 24 Quarter colony and 5by130 and in front to shiv mandir in ward - 13 zone-4.
2026_NNKAN_1118441_1
191/AA-4/25-26
Open Tender
Civil Works
Percentage
60 days
ward-13
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹3.0 L
12 May 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
Dismentaling of B.O.E. soling/ interlocking tiles including stacking of sevicable material and disposal of unsevicable material within a lead of 50m as per deirection of EI/C (Labour only)
Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr.
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m ,as directed by engg-in-charge:2.1.1 All kinds of soil.
Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete.
Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work.
Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand)
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering. 1:6:12 (1 cement : 6 coarse sand : 12 graded Brick aggregate 40mm (nominal size).
Providing & laying in position specified grade of reinforced cement cocrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm.
Centering & shuttering including strutting, propping etc and removal of form work (upto 5th floor) : Retaining walls, return walls, walls (any thickness) including attavhed pilasters, buttersses, plinth and string courses fillets, kerbs, and steps etc
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level. Thermo mechanically treated bars of grade Fe-500D or more.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment)
Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work.
Making connection of pipe to the existing manhole/sewer line etc all complete.
Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401.
Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:2:4 (1 cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 200 mm nominal size
Cartage of materials by head load up to 90.0mtr distance with all charges complete.
Disposal of surplus earth/malwa upto 3.00km distance including loading/unloading of material with all charge complete.
Add 18 % G.S.T.
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2078921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.98 MB
BOQ_2078921.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .