Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-Finance BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹11.1 L+₹553.41 (0.05%)Rejected-Finance 35 DANDHI DANDHI DANDHI MAU UTTAR PRADESH 275305 | MAU | UTTAR PRADESH | 275305 | L2 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹11.1 L
EMD Value
₹1.1 L
Closing Date
16 Jun 2026, 1:00 pmClosed
EXECUTIVE OFFICER
NPP MAU
Ward No. 02 Bhiti ke Mohalla badikot nai basti me Suresh ke makan se Arjun Rajbhar ke makan tak interlocking road va nali nirmad karya.
2026_DOLBU_1131264_2
68-266
Open Tender
Civil Works
Percentage
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Yes
EXECUTIVE OFFICER
₹1.1 L
17 Jul 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site, silt etc all complete. | 1 | Each | 5,000 | ₹5,000 |
| 2 | Earth work filling in embackment with cartage soil up to 8km distance etc all complete. | 108.28 | Cum | 301 | ₹32,592.28 |
| 3 | Dismantlig of brick work stacking of materials as directed by the engineer-in-charge with the distance of 60 mm. work. S.I No. 692 | 18.24 | Cum | 435 | ₹7,934.4 |
| 4 | Earth work in Excavation in ordinery soil in foundation including labour and materials and T/P etc all complete. | 84.59 | Cum | 115 | ₹9,727.85 |
| 5 | P/L of concrete with 40 mm gauge brick ballast fine sand and cement in 12:6:1 etc all complete. S.I No. 273 | 15.85 | Cum | 3,250 | ₹51,512.5 |
| 6 | M-150 Brick work in 1:4 cement and sand mortar supply of all materials, labours etc including all complete work.
(Deduction of old bricks & old bricks bats Rs.17367.00+6838.00=24205.00 | 37.29 | Cum | 4,980 | ₹1,85,702 |
| 7 | 12mm thick Plaster work in 1:3 with cement and fine sand motar etc all Comlete. S.I No. 583 | 82.32 | Sqm | 189 | ₹15,558 |
| 8 | R.C.C in 1:1½:3 cement course sand and 20mm gauge including labour and materials etc all complete. S.I No. 285 | 0.41 | Cum | 9,430 | ₹3,866.3 |
| 9 | MS work in R.C.C work iincluding labour and materials all complete work. S.I No. 504 | 0.32 | Qtl | 5,650 | ₹1,808 |
| 10 | Granural sub- bace (G.S.B) with garded material by mix in place method. | 39.78 | Cum | 3,492.6 | ₹1,38,935.63 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166574.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .