Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.0 LAccepted-AOC | 1 | Accepted-AOC RANK 1 | |
| 2 | 2₹23.7 L+₹87,048.69 (3.81%)Rejected-Finance WARD NO 6 RAILWAY ROAD OPP PETROL PUMP LEHRAGAGA DIST SANGRUR 148031 | SANGRUR | PUNJAB | 148031 | 2 | Rejected-Finance RANK 2 |
| Sl No | Description | Qty | Unit | APEX CONSTRUCTIONS L1 | RAVI KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil. Mechanical Means. Depth upto 3 m. | 434.92 | cum | 82 ₹35,663.44 Lowest | 90 ₹39,142.8 |
| 2.00 | Preparing, watering and ramming surface for laying concrete | 95.97 | sqm | 31.36 ₹3,009.62 Lowest | 40 ₹3,838.8 |
| 3.00 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 49.39 | cum | 5,428 ₹2,68,088.92 Lowest | 5,700 ₹2,81,523 |
| 4.00 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE: Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M25. Height upto 5m. With Batching Plant, Transit Mixer and Concrete Pump | 133.26 | cum | 6,509 ₹8,67,389.34 Lowest | 6,780 ₹9,03,502.8 |
| 5.00 | Supplying & laying dry brick ballast. | 1.64 | cum | 1,723 ₹2,825.72 Lowest | 1,854 ₹3,040.56 |
| 6.00 | BRIDGES- FOUNDATIONS & SUB- STRUCTURE: Supplying,
fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. | 10.76 | mt | 83,000 ₹8,93,080 Lowest | 85,000 ₹9,14,600 |
| 7.00 | Shuttering for faces of concrete foundations and foundation beam plinth beam (vertical or battering) | 389 | sqm | 235 ₹91,415 Lowest | 250 ₹97,250 |
| 8.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 17.16 | cum | 6,200 ₹1,06,392 Lowest | 6,345 ₹1,08,880.2 |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 56.6 | sqm | 198 ₹11,206.8 Lowest | 230 ₹13,018 |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Floors | 34.05 | sqm | 154 ₹5,243.7 Lowest | 180 ₹6,129 |
Tender Value
₹20.3 L
EMD Value
₹40,608
Closing Date
28 Aug 2025, 10:00 amClosed
Executive Engineer Ludhiana Canal and GW Water Div
Executive Engineer Ludhiana Canal and GW Water Division WRD Dugri Phase 1 Ludhiana
Estimate for Cross Drainage Structure of main branch of outlet 49055 TF of 2L Minor of Zira Disty
2025_WR_144902_1
2496/28A
Open Tender
Civil Works - Canal
Item Rate
Zira Disty
Estimate for Cross Drainage Structure of main branch of outlet 49055 TF of 2L Minor of Zira Disty
2 documents required · 2 mandatory
₹2,000
₹40,608
Yes
3 Nov 2025
15 Jul 2025
28 Aug 2025
15 Jul 2025
28 Aug 2025
15 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .