| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹12.6 L+₹50,743.37 (4.21%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹12.2 L
EMD Value
₹13,000
Closing Date
16 Apr 2025, 3:00 pmClosed
BDO VP THALLY
BDO OFFICE THALLY
Thally Block_AGAMT_ II_2025_26_1.Providing of Threshing Floor at Choodasandiram _Rs.9.21 Lakhs_ 2.Providing Paver Block from Sundar Raj House to Mahadevan House at Choodasandram_ Rs.3.00 Lakhs - Rs. 12.21 Lakhs _TLY17
2025_RDTN_541199_1
Roc_5345_2025_R10_03_04_2025
Open Tender
Civil Works - Others
Item Rate
180 days
BDO OFFICE THALLY
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
BDO OFFICE THALLY
26 Apr 2025
8 Apr 2025
16 Apr 2025
8 Apr 2025
16 Apr 2025
8 Apr 2025
11 Apr 2025
Amount
1.Providing of Threshing Floor at Choodasandiram H/o Choodasandiram - Rs.9.21 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Main wall all-round
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Roofing with best quality tuflon sheet
Supplying and fixing 50mm GI Pipe Including all labour charges etc., completed
Providing Bitumen felt 15mm Thick pad
Providing soak pit arrangements Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete 3.14/4 = 0.785
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifictio
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
cost supply and filling of 40mm HBG metal including cost and conveyance of men and materials etc., all complete
Towards cost supply and filling of 20mm Brick jelly including cost and conveyance of men and materials etc., all complete
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
* Supply and fixing of 4" dia pvc pipe including all cost and conveyance of men and materials etc., all complete
Provision for Name board charegs
Provision for Photo Graphic Charegs
2.Providing Paver Block from Sundar Raj House to Mahadevan House at Choodasandram H/O Choodasandram - Rs.3.00 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. Pavement
Kerb Wall
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supplying and laying of Interlocking Paver Block Stone 60mm thk. Over a base layer of sand filling incl. Cost of materials laying and Labour charges etc.,
Provision For Writing name board Charges
Provision For Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VIJAY ENTERPRISE (BID ID -1300742)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .