Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.8 LAccepted-Finance | ₹90.8 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹90.8 LSame as L1Rejected-Finance | ₹90.8 LSame as L1 | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹90.8 L+₹108.06 (<0.01%)Rejected-Finance | ₹90.8 L+₹108.06 (<0.01%) | L3 | Rejected-Finance 3rd Lowest |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
6 Jan 2023, 12:00 pmClosed
Executive Engineer
EE, UD and H, Boleng Division
Const. of RCC Storm Water Drainage System at Market area of Boleng township
2022_APUDH_983_1
EE/UDH/BLG/W-43/2022-23/01
Open Tender
Civil Works
Item Rate
365 days
Boleng
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
EE, UD and Housing, Boleng Division
₹96,000
31 Jan 2023
30 Dec 2022
6 Jan 2023
30 Dec 2022
6 Jan 2023
30 Dec 2022
Amount
Earthwork in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50 m.
Providing and laying in foundations and plinth cement concrete 1:4:8 (1cement : 4 Coarse sand : 8 graded) stone aggregate 40mm nominal size) excluding the cost of centring and shuttering.
Providing and laying in foundations and plinth cement concrete 1: 5 : 10 (1cement : 1.5 Coarse sand : 10 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering.
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement Cement Concrete in Walls ( any Thickness) including attached pillasters, buttresses, plinth and string course fillet etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3 (1cement : 3 fine sand) of thickness not exeeding 6mm to give a smooth and even surface excluding cost of centering and shuttering and reinforcement in:
a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of R.C.C. Work including bending binding and placing in position complete.
a) Mild steel
12 mm cement plaster 1:3 ( 1cement : 3 fine sand)
Neat cement punning
Centring & Shuttering including struttting, propping etc and removal of form work for:
a) Foundation and plinth
b) Walls inlcuding attached buttresses, pilasters etc
Add Carriage charge
M/S SAMUEL FABRICATION
Shri Talung Tatak
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1093.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .