| 1 | L1₹46.7 LAccepted-Finance SHOP NO 13 45 FEET ROAD BHARAT COLONY FARIDABAD HARYANA 121014 | FARIDABAD | HARYANA | 121014 | ₹46.7 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹50.0 L+₹3.3 L (7.00%)Rejected-Finance | ₹50.0 L+₹3.3 L (7.00%) | L2 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 3 | L3₹54.3 L+₹7.5 L (16.1%)Rejected-Finance | ₹54.3 L+₹7.5 L (16.1%) | L3 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 4 | L4₹55.2 L+₹8.5 L (18.2%)Rejected-Finance | ₹55.2 L+₹8.5 L (18.2%) | L4 | Rejected-Finance HIGHER THAN L1 BIDDER |
| 5 | L5₹55.5 L+₹8.8 L (18.8%)Rejected-Finance 329 COD COLONY KOYLA NAGAR PO KIDWAI NAGAR KANPUR 208011 | KANPUR | KANPUR | UTTAR PRADESH | 208011 | ₹55.5 L+₹8.8 L (18.8%) | L5 | Rejected-Finance HIGHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | DEO Traders L5 | U.R ASSOCIATES L7 | YS CONSTRUCTION L2 | FATEHPUR CONSTRUCTION COMPANY L6 | ashokcontractors L9 | S DAYA SINGH L8 | Haryana EngineerService L1 | NEW TECH ELCTRICALS L3 | SAKSHAM SUPPLIERS BUILDERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables, foundation filling of poles or stays and for rerouting of cables complete all as specified and directed. | 416.34 | Cum | 300 ₹1,24,902 | 300 ₹1,24,902 | 90 ₹37,470.6 Lowest | 300 ₹1,24,902 | 120 ₹49,960.8 | 111 ₹46,213.74 | 129 ₹53,707.86 | 90 ₹37,470.6 Lowest | 120 ₹49,960.8 |
| 2.00 | Returning filling including spreading, leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed. | 121.86 | Cum | 100 ₹12,186.38 | 200 ₹24,372.76 | 30 ₹3,655.91 Lowest | 55 ₹6,702.51 | 50 ₹6,093.19 | 90 ₹10,967.74 | 49 ₹5,971.33 | 30 ₹3,655.91 Lowest | 45 ₹5,483.87 |
| 3.00 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed. | 294.48 | Cum | 300 ₹88,342.87 | 300 ₹88,342.87 | 20 ₹5,889.52 Lowest | 200 ₹58,895.24 | 60 ₹17,668.57 | 80 ₹23,558.1 | 39 ₹11,484.57 | 20 ₹5,889.52 Lowest | 45 ₹13,251.43 |
| 4.00 | S&F in trenches 50/38 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205 , smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,360 | RM | 60 ₹81,600 | 100 ₹1,36,000 | 50 ₹68,000 | 100 ₹1,36,000 | 100 ₹1,36,000 | 65 ₹88,400 | 44 ₹59,840 Lowest | 50 ₹68,000 | 80 ₹1,08,800 |
| 5.00 | S&F in trenches 63/50 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205, smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,850 | RM | 70 ₹1,29,500 | 120 ₹2,22,000 | 70 ₹1,29,500 | 120 ₹2,22,000 | 150 ₹2,77,500 | 78 ₹1,44,300 | 49 ₹90,650 Lowest | 70 ₹1,29,500 | 95 ₹1,75,750 |
| 6.00 | S&F in trenches 90/76 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205, smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,930 | RM | 80 ₹1,54,400 | 150 ₹2,89,500 | 125 ₹2,41,250 | 130 ₹2,50,900 | 200 ₹3,86,000 | 100 ₹1,93,000 | 53.9 ₹1,04,027 Lowest | 125 ₹2,41,250 | 120 ₹2,31,600 |
| 7.00 | M&L for pre cast cement concrete (1:4:8) type D2 (using 40mm graded stone aggregate) for foundation filling of poles or LT panels as mass concrete complete all as specified and directed. | 1 | Cum | 2,000 ₹2,000 | 6,000 ₹6,000 | 1,800 ₹1,800 Lowest | 4,000 ₹4,000 | 3,000 ₹3,000 | 2,233 ₹2,233 | 4,999 ₹4,999 | 1,800 ₹1,800 Lowest | 2,500 ₹2,500 |
| 8.00 | M&L for pre cast cement concrete (1:3:6) type C2 (using 40mm graded stone aggregate) for foundation filling of stays complete all as specified and directed. | 1 | Cum | 2,000 ₹2,000 Lowest | 6,000 ₹6,000 | 2,250 ₹2,250 | 5,600 ₹5,600 | 4,500 ₹4,500 | 3,233 ₹3,233 | 4,999 ₹4,999 | 2,250 ₹2,250 | 3,000 ₹3,000 |
| 9.00 | Demolition of cement concrete (un-reinforced) in ground, floors or pavings not exceeding 15 cm thick below or above ground level complete all as specified and directed. | 1 | Cum | 1,000 ₹1,000 | 1,000 ₹1,000 | 100 ₹100 Lowest | 900 ₹900 | 500 ₹500 | 444 ₹444 | 4,999 ₹4,999 | 100 ₹100 Lowest | 2,500 ₹2,500 |
| 10.00 | M&L for PCC (1:2:4) type B-1 (using 20mm graded stone aggregate) as in floor / hard-standing, surface finished even and smooth without using extra cement to match with the existing surface complete all as specified and directed. | 1 | Cum | 2,000 ₹2,000 Lowest | 8,500 ₹8,500 | 2,400 ₹2,400 | 7,500 ₹7,500 | 6,500 ₹6,500 | 4,334 ₹4,334 | 4,999 ₹4,999 | 2,400 ₹2,400 | 3,000 ₹3,000 |
Tender Value
₹48.5 L
EMD Value
₹97,000
Closing Date
12 Jun 2026, 6:00 pmClosed
Lt Col, Vikramjeet Singh Reen
GE I Kanpur Cariappa Road Cantt Kanpur 208004
COMPREHENSIVE MAINT/REPLACEMENT OF LT CABLE AND MISCELLANEOUS ITEMS FOR ZONE-III AND ZONE-IV AREA UNDER GE (I) KANPUR
2026_MES_767225_1
GE(I)/KAN/T-12 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
KANPUR
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(I) KANPUR
₹97,000
Yes
25 Sept 2026
22 May 2026
19 Jun 2026
22 May 2026
12 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in any type of soil n exc 1.5 mtr in width and n. exc 1.5 mtr in depth and getting out all as required for laying of cables, foundation filling of poles or stays and for rerouting of cables complete all as specified and directed. | 416.34 | Cum | - | - |
| 2 | Returning filling including spreading, leveling, watering and well ramming in layers not exc 25 cm each all as required complete all as specified and directed. | 121.86 | Cum | 2 | ₹243.73 |
| 3 | Removing excavated material to a distance not exceeding 50 meters and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as specified and directed. | 294.48 | Cum | 3 | ₹883.43 |
| 4 | S&F in trenches 50/38 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205 , smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,360 | RM | 4 | ₹5,440 |
| 5 | S&F in trenches 63/50 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205, smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,850 | RM | 5 | ₹9,250 |
| 6 | S&F in trenches 90/76 mm HDPE Double wall corrugated (DWC) Pipes for duct cable as per IS 16205, smooth inner surface and a corrugated outer surface to provides strength and resistance to compression load while smooth inner surface ensures efficient flow all as required complete all as specified and directed. | 1,930 | RM | - | - |
| 7 | M&L for pre cast cement concrete (1:4:8) type D2 (using 40mm graded stone aggregate) for foundation filling of poles or LT panels as mass concrete complete all as specified and directed. | 1 | Cum | 2 | ₹2 |
| 8 | M&L for pre cast cement concrete (1:3:6) type C2 (using 40mm graded stone aggregate) for foundation filling of stays complete all as specified and directed. | 1 | Cum | 3 | ₹3 |
| 9 | Demolition of cement concrete (un-reinforced) in ground, floors or pavings not exceeding 15 cm thick below or above ground level complete all as specified and directed. | 1 | Cum | 4 | ₹4 |
| 10 | M&L for PCC (1:2:4) type B-1 (using 20mm graded stone aggregate) as in floor / hard-standing, surface finished even and smooth without using extra cement to match with the existing surface complete all as specified and directed. | 1 | Cum | 5 | ₹5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_859228.xls
BOQ • 2.06 MB
TenderdocumentsT12.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .