Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹1.1 LAccepted-Finance | ₹1.1 L | 1ST | Accepted-Finance 1st Lowest |
| 2 | 2ND₹1.2 L+₹5,237.18 (4.69%)Rejected-Finance | ₹1.2 L+₹5,237.18 (4.69%) | 2ND | Rejected-Finance 2nd Lowest |
| 3 | 3RD₹1.2 L+₹6,164.02 (5.52%)Rejected-Finance | ₹1.2 L+₹6,164.02 (5.52%) | 3RD | Rejected-Finance 3rd Lowest |
Tender Value
₹1.1 L
EMD Value
₹2,300
Closing Date
25 Aug 2026, 11:00 amClosed
EE(C)/BR-IV
213B, C.R. AVENUE. KOL - 6
PROTECTION OF TOE WALL AT ADDYA SRADYA GHAT AND P.K. TAGORE GHAT IN WARD NO-21 UNDER BOROUGH-IV
2026_KMC_1038159_1
KMC/EE(C)/Br-IV/21/5/26-27/R
Open Tender
CIVIL WORKS
Percentage
7 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,300
3 Sept 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)b)Medium Sand (Finenses moduls 1.8 to 2). Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible. istricts may add necessary carriage cost as applicable | 56.64 | M3 | 905 | ₹51,260.1 |
| 2 | Supplying empty Cement bags in good condition. | 16 | NOS | 330 | ₹5,280 |
| 3 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 16 | NOS | 350 | ₹5,600 |
| 4 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 4)Mazdoor (Female). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 106 | EA | 245 | ₹25,970 |
| 5 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 1) Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptus or other approved timber posts 1.4 m above G.L. and 0.60 m below G. including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade. (Cost of restoration would be paid separately.) (a) 75mm. dia bamboo railing & 125mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart. (ii) Railing with 3 rows. | 114 | MTR | 49 | ₹5,586 |
| 6 | Sub Total | - | - | - | - |
| 7 | GST 18% | - | Nos. | - | - |
| 8 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2550260.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .