| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹60,000Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹62,090+₹2,090 (3.48%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹62,498+₹2,498 (4.16%)Accepted-Finance | 3 | Accepted-Finance found eligible | |
| 4 | 4₹63,200+₹3,200 (5.33%)Accepted-Finance BHAGWATI NAGAR JAMMU | 4 | Accepted-Finance found eligible |
Tender Value
₹80,000
Closing Date
26 Nov 2021, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowsh
Office of the Executive Engineer MID Akhnoor/Nowsh
Repairs to 3 cusec discharge HC pump with allied works at LIS Dhakker
2021_IFC_149142_1
106/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Office of the Executive Engineer MID Akhnoor/Nowsh
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
21 Dec 2021
20 Nov 2021
27 Nov 2021
20 Nov 2021
26 Nov 2021
21 Nov 2021
22 Nov 2021
Repairs to 40HP 3 phase induction motor of unit no. 02 installed at LIS Dhakker. The job involves disconnecting the power supply of all three phases , decoupling the motor from the pump and unfastening the foundation nuts and bolts. Shifting the motor to roadside by using manual labour and then to workshop through mechanical transport. Unloading of motor at workshop . Complete dismantling of the motor, extraction of rotor . Extraction of burnt winding from the stator, cleaning of stator with petrol .P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor and shifting back to L.I.S. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump , testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. Complete job
Repairs to 3 cusec discharge 17 m head horizontal centrifugal pump of pumping Unit No.1, installed at LIS Dhakker The job involves de-coupling of pump from the motor and removing top cover of the HC pump, extracting the internal impeller assembly together with bearing brackets and shifting the same to workshop by using mechanical transport. Complete dismantling of the impeller assembly in the workshop. P/F of 2-No bushes & 2-No bearings(6309) as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Fitment of impeller/ shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Setting the foundation by means of replacement of old worn out studs. Job also includes replacement of worn-out nuts, bolts and bushes of the existing coupling pulley along with tyre. Providing / fitting of gland packing. Greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles, out station charges etc. Complete Job
SMART TECH AND CO
PERFECT ELECTRICAL WORKS
M/S FASTTRACK ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .