Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Finance | -38.11% | ₹22.3 L | L1 | Admitted-Finance |
| 2 | L2₹22.5 LAdmitted-Finance | -37.57% | ₹22.5 L | L2 | Admitted-Finance |
| 3 | L3₹24.4 LAdmitted-Finance | -32.35% | ₹24.4 L | L3 | Admitted-Finance |
| 4 | L4₹24.4 LAdmitted-Finance | -32.14% | ₹24.4 L | L4 | Admitted-Finance |
| 5 | L5₹27.0 LAdmitted-Finance | -25.11% | ₹27.0 L | L5 | Admitted-Finance |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
22 May 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_309669_3
e-NIT No.11 of 2026-27 Dated 09-05-2026
Open Tender
Civil Works
120 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹1,100
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹72,000
5 Jun 2026
9 May 2026
23 May 2026
9 May 2026
22 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed . | 21.01 | Cum | 5,202.9 | ₹1,09,312.93 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 23.04 | Cum | 6,591.25 | ₹1,51,862.4 |
| 3 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) . Ordinary cement without any pigment. | 209.1 | Sqm | 903.85 | ₹1,88,995.04 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) & Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level. | 51.18 | Cum | 9,027.2 | ₹4,62,012.1 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size). | 3.67 | Cum | 9,395.7 | ₹34,482.22 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.51 | Cum | 9,821.85 | ₹44,296.54 |
| 7 | Reinforcement for RCC work including straightening cutting, bending, placing in position & binding all complete with TMT bars. | 981.6 | Kg | 123.2 | ₹1,20,933.12 |
| 8 | Centring and Shuttering including strutting, propping etc and removal of form work for Columns, Pillars, Piers, Abutments, Posts and Struts. | 47.95 | Sqm | 742.55 | ₹35,605.27 |
| 9 | Centring and Shuttering including strutting, propping etc and removal of form work for Lintels, beams, plinth beams, girders,bressumers and cantilevers. | 38.49 | Sqm | 577.55 | ₹22,229.9 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): (Sal Wood). | 1.1 | cum | 1,42,085.65 | ₹1,56,294.22 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_1002330.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid