Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | ₹15.8 L Quoted ₹18.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.8 LRejected-AOC | ₹16.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MRP ENTERPRISES | ASHWATH MARINE INFRA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m including cost of all materials, labours, lead, lift, etc. complete | 653 | M3 | 64,647 ₹76,283.46 | 59,096.5 ₹69,733.87 |
| 2.00 | Providing shoring and shuttering on all sides as directed, for holding firmly, the soil on the sides without any sliding, rate includes for cost of CW Planks, reaper, casurina posts with all labour, lead, lift, and dewatering etc., complete. | 79.9 | M2 | 54,332 ₹64,111.76 | 49,617.9 ₹58,549.12 |
| 3.00 | Providing PCC 1:3:6 using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing and dewatering etc. complete. | 11 | M3 | 73,007 ₹86,148.26 | 66,660 ₹78,658.80 |
| 4.00 | Providing form work for concreting at all elevations and below GL to give medium smooth finish using steel shutters including cost of all materials, labour, lead, lift etc. complete. | 166.5 | M2 | 98,235 ₹1.2 L | 89,743.5 ₹1.1 L |
| 5.00 | Providing RCC 1:1.5:3 using OP/PP cement with 20mm metal machine crushed rate including cost of all materials, labours, lead, lift, curing and dewatering etc. complete - excluding cost of reinforcement and form work. | 51.3 | M3 | 5,61,119.4 ₹6.6 L | 5,12,358.75 ₹6.0 L |
| 6.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift and dewatering etc., complete. | 4,102 | Kg | 4,30,710 ₹5.1 L | 3,93,792 ₹4.6 L |
| 7.00 | Providing Rough stone pitching to a required thickness using rouh stone as directed by the Engineer at site including cost of all materials, lead, lift, labour etc rate including cost of all materials, labour, lead, lift etc. complete | 102.7 | M3 | 2,65,684.9 ₹3.1 L | 2,42,680.1 ₹2.9 L |
| 8.00 | Providing two legged scaffolding for works upto 3m. heights, using 10 to 13 cm. dia. casuarina props, the distance between the two rows being 1.25m. and the spacing of posts being 2m. in both the rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m. c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm. thick & 1m. width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete. | 18 | M2 | 3,294 ₹3,886.92 | 3,015 ₹3,557.70 |
| 9.00 | Dismantling and Re-erecting the dismantled Ash Dyke Steel Gate and fixing in proper position, alignment and verticality, rate including cost of labour, tools such as welding machine, rod, cutting torch with gas oxygen and acetylene, hire charges for welding machine, Gas cutting machine etc., complete. | 980 | Kg | 42,140 ₹49,725.20 | 39,200 ₹46,256 |
| 10.00 | Supply of MS Plates, ISMB etc., including cost of material lead, lift, Transporting etc., complete. | 263.5 | Kg | 15,810 ₹18,655.80 | 14,663.78 ₹17,303.26 |
Tender Value
Refer Docs
EMD Value
₹14,100
Closing Date
26 Nov 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Providing RCC Culvert in Ash Dyke Gate and Providing Stone Pitching Drain from Ash Dyke Gate to Outfall at TTPS
2025_EB_622400_1
CE SE C TTPS 331 2025 26
Open Tender
Civil Works - Others
150 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,100
Yes
12 Mar 2026
11 Nov 2025
27 Nov 2025
11 Nov 2025
26 Nov 2025
11 Nov 2025
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m including cost of all materials, labours, lead, lift, etc. complete
Providing shoring and shuttering on all sides as directed, for holding firmly, the soil on the sides without any sliding, rate includes for cost of CW Planks, reaper, casurina posts with all labour, lead, lift, and dewatering etc., complete.
Providing PCC 1:3:6 using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing and dewatering etc. complete.
Providing form work for concreting at all elevations and below GL to give medium smooth finish using steel shutters including cost of all materials, labour, lead, lift etc. complete.
Providing RCC 1:1.5:3 using OP/PP cement with 20mm metal machine crushed rate including cost of all materials, labours, lead, lift, curing and dewatering etc. complete - excluding cost of reinforcement and form work.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift and dewatering etc., complete.
Providing Rough stone pitching to a required thickness using rouh stone as directed by the Engineer at site including cost of all materials, lead, lift, labour etc rate including cost of all materials, labour, lead, lift etc. complete
Providing two legged scaffolding for works upto 3m. heights, using 10 to 13 cm. dia. casuarina props, the distance between the two rows being 1.25m. and the spacing of posts being 2m. in both the rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m. c/c including longitudinal & transverse middle braces to stepup and providing a platform with country wood planks of 40 mm. thick & 1m. width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete.
Dismantling and Re-erecting the dismantled Ash Dyke Steel Gate and fixing in proper position, alignment and verticality, rate including cost of labour, tools such as welding machine, rod, cutting torch with gas oxygen and acetylene, hire charges for welding machine, Gas cutting machine etc., complete.
Supply of MS Plates, ISMB etc., including cost of material lead, lift, Transporting etc., complete.
Providing and fixing well point system for dewatering the ground water including hire charges for 2 Nos 10 HP vacuum dewatering pumps and a spare pump with 30 filters, operator cost of 3 shifts for 2Nos 10HP and maintenance cost, current consumption charges complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_744187.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid