Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,740
Closing Date
3 Sept 2026, 6:00 pm6d left
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI ROOM
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Const. of Protection wall and drain at the back side residential house of brij Paul Singh W.No.07 Pyt Dhirti Block Panthal Reasi Under CDF for the year 2026-27.
2026_RDPR_322487_1
e-NIT No. 134 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹5,740
27 Aug 2026
27 Aug 2026
4 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil | 68 | Sqm | 187.3 | ₹12,736.4 |
| 2 | Providing and laying dry stone Aggregate of 40mm nomminal size in foundation and Plinth including all leads, lift and carriage complete | 5.6 | Cum | 1,500 | ₹8,400 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.55 | Cum | 5,733.6 | ₹89,157.48 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone including all leads, lift and carriage complete | 49 | Cum | 2,793.8 | ₹1,36,896.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns | 46 | Sqm | 286.35 | ₹13,172.1 |
| 6 | Construction of CIB (Include concrete/Brick pedestal of size 3' x 2'. Platering ,painting all complete job as per direction of Engineer-in-charge | 1 | No. | 3,500 | ₹3,500 |
| 7 | Carriage of material from source to site of work Cement 5.00 KM by MT . | 3.39 | MT | 178.43 | ₹604.88 |
| 8 | Carriage of material from source to site of work Sand & Agg 15.0 KM by MT. | 29.64 | Cum | 344.49 | ₹10,210.68 |
| 9 | Carriage of material from source to site of work Stone 6.0 KM by MT. | 49 | Cum | 254.59 | ₹12,474.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_1081937.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].