| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | L1 | Accepted-Finance Lowest one | |
| 2 | L2₹3.6 L+₹19,146.01 (5.60%)Rejected-Finance PO DHARCHANDNA TEHSIL CHOPAL DISTT SHIMLA | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹3.7 L+₹23,383.59 (6.84%)Rejected-Finance JOGINDER NAGAR | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹3.9 L+₹46,857.31 (13.7%)Rejected-Finance CONTR VILLAGE BIHALI PO LARJI TEHSIL SAINJ DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172002 | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹4.0 L+₹53,985.31 (15.8%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹5.0 L
EMD Value
₹15,000
Closing Date
6 Nov 2023, 11:00 amClosed
DPO, IDP, Shimla at Shoghi
DPO, IDP, Shimla at Shoghi
C/o Makowal type structure (PWS) at Shapra nallah, Providing and laying , jointing of HDPE pipe nallah to near village Shapra in GP Nanhar for the year 2023-24 under APO unit Nerwa
2023_CPD1_80849_2
PWS/007/re tender/2023-24
Open Tender
Civil Works - Water Works
Item Rate
60 days
Nerwa Shimla H.P.
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DPO, IDP
₹15,000
6 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
31 Oct 2023 - 6 Nov 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.50 m, as directed by Engineer-in-charge All kind of soil / Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressingof sides and ramming of bottoms, lift upto 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed by Engineer-in-charge Ordinary rock
All kind of soil / Ordinary rock
Dry stone soiling / pitching 15 cm thick including supply of stones and preparing surface complete carriage of material in all lead and lifts
P/L cement Concrete 1:4:8 (1 cement:4 Sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
Providing and laying in position specified grade of reinforced cement Concrete work 1:2.4( 1 : cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
Providing steel reinforcement for RCC work including straightening , cutting , bending, placing in position and binding all complete upto plinth & above level carriage of material in all lead and lifts Mild steel and Medium Tensile steel bars
P/L cement Concrete 1:3:6 (1 cement :3 Sand :6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
P/L cement Concrete 1:5:10 (1 cement:5 Sand:10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand :12 graded stone aggregate 20 mm nominal size ) upto plinth level with carriage of material in all lead and lifts Cement mortor 1:6 ( 1cement : 6 coarse sand )
P/F work with steel plates 3.15 mm thick weldid with angle iron in frame 30x30x5mm so as to give a fair finish including sentring, shuttering , strutting and propping etc. with wooden battens and ballis, height of propping and sentring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concret and plain concret work in carriage of material in all lead and lifts vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string cources and the like
Suspended floors, roofs, landing and their support balconnies and access platform etc.
cement concrete flooring 1:2:4 (1cement :2 coarse sand :4 graded stone aggregate ) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete carriage of material in all lead and lifts 40 mm thick with 20mm nominal size stone aggregate
Supplying , filling , levelling gravels, for filter boulder , sand , stone aggregate in required thickness, for all lead and lifts complete as per direction of engineer-in charge
Smooth finishing of the exposed surface of RCC work with 6 mm thick cement plaster in cement mortar 1:3 (1cement :3 sand ) carriage of material in all lead and lifts
Providing and fixing of GI pipe 40 mm dia in all respect complete carriage of material in all lead and lifts
P/F of MS wheel valve 40 mm dia with nipples and reducers in all respect complete carriage of material in all lead and lifts
Providing and fixing ,laying of HDPE pipe ISI marked 40 mm nominal dia grade PE 80,Pressure Rating PN 6, SDR 17 confirming to IS:4984-2016 with fitting and jointing of all accerssories etc complete carriage of material in all lead and lifts
Providing and fixing ,laying of HDPE pipe ISI marked 32 mm nominal dia grade PE 80 ,Pressure Rating PN 6, SDR 13.60 confirming to IS:4984-2016 with fitting and jointing of all accessories etc complete carriage of material in all lead and lifts
Providing and fixing of sign board with writting angle iron frames, welded M.S sheet, painting etc.in all respect complete carriage of material in all lead and lifts.
Tulsi Ram
AMIT KUMAR
Mohan Lal
Bhag Chand
arun thakur
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .