| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹35.0 LAccepted-AOC | l1 | Accepted-AOC L1 | |
| 2 | l2₹37.6 L+₹2.7 L (7.62%)Rejected-AOC | l2 | Rejected-AOC L2 |
Tender Value
₹21.9 L
EMD Value
₹40,340
Closing Date
27 Aug 2019, 5:00 pmClosed
Executive Engineer, Chamba Division HPPWD Chamba
Executive Engineer, Chamba Division HPPWD Chamba
Construction of Link road to village Ghutnu Km, 0/0 to 1/500 Formation cutting work in 0/0 to 1/0
2019_PWD_30899_2
No.PWC-WA-II/5930-6029 dated 29.7.19
Open Tender
Civil Works - Roads
Item Rate
180 days
Chamba
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Engineer, Chamba Division HPPWD Chamba
₹40,340
30 Jun 2020
14 Aug 2019
28 Aug 2019
14 Aug 2019
27 Aug 2019
14 Aug 2019
Amount
Excavation in hilly area in all heights and depths and in all kind of soil by manual /mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock chiselling, wedging out of rock(where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades ,width, cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603.1 and 1603.2 and sorting out useful materials and stacking the same within all leads and lifts in acquired width of road and transportation of un-useful material for filling in road ways camber, embankments for grade improvements and disposal of all surplus material to approved dumping sites through all modes of transportation including head load or animal transport or mechanical means alongwith its leveling fine dressing and carriage of machineries ,materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means/ labour if required. The recovery for 1323.57 cubic metre useful stones shall be made at the rate of Rs. 300/- (Rupees Three Hundred only) per cubic metre from the bills on pro-rata basis. Any loss to the public private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him in all cases.
Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .