Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.5 LAccepted-AOC 6 4 70 ADARSHNAGAR NEAR SHIVARAMPALLY RAILWAY STATION RAJENDRANAGAR RANGAREDDY 500077 | RANGA REDDY | TELANGANA | 500077 | ₹25.5 L | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹25.6 L+₹11,485 (0.45%)Rejected-Finance 6 4 70 ADARSH NAGAR SAI BABA NAGAR ARAMGHAR RAJENDRANAGAR RANGA REDDY TELENGANA PIN 500052 | RANGA REDDY | TELANGANA | 500052 | ₹25.6 L+₹11,485 (0.45%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹25.6 L+₹11,876 (0.47%)Rejected-Finance H NO 8 2 603 H 62 GB NAGAR ROAD NO 10 BANJARA HILLS HYDERABAD 500034 | HYDERABAD | HYDERABAD | TELANGANA | 500034 | ₹25.6 L+₹11,876 (0.47%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹25.7 L
EMD Value
₹51,321
Closing Date
25 Jul 2024, 10:55 amClosed
DEPUTY COMMANDANT ENGINEER
WORKS DIRECTORATE CRPF EAST BLOCK-7, LEVEL-III, RK PURAM, SECTOR-1, NEW DELHI
PROVIDING AND LAYING RCC PERFORATED DRAIN COVERS (HEAVY DUTY) AND DEVELOPMENT OF CHILDREN PARK AND VEHICLE PARKING AND OTHER MISCELLANEOUS WORKS FOR 77 NOS FAMILY QUARTERS
2024_CRPF_816098_1
B.V.GCHYD/24-25/WORKS/NIT-28
Open Tender
Civil Works
Works
90 days
GC CRPF HYDERABAD
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹51,321
10 Sept 2024
11 Jul 2024
26 Jul 2024
11 Jul 2024
25 Jul 2024
11 Jul 2024
11 Jul 2024 - 19 Jul 2024
Amount
Carriage of material by Mechanical transport including loading, uploading and stacking etc. complete as per direction of Engineer-in-charge.Note: The rate will be applicable to net quantities after deduction of prescribed percentage for voids.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge : All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6(1 cement : 6 coarse sand)
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer : G.I. pipes
Providing and fixing Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) : Dark shade pigment using ordinary cement
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Raised and cut pointing
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.75 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge.
NOTE:- All items to be used in this work should be branded and ISI certified or CPWD approved list of material may be followed. If any make is not specified, decision of Engineer-in-charge shall be final and binding.
K arjun kumar
M A RAHEEM CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .