Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | ₹26.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.5 L+₹53,819 (2.07%)Rejected-Finance | ₹26.5 L+₹53,819 (2.07%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
12 Jul 2024, 3:00 pmClosed
Additional Collector(Dev)
DRDA, Ramanathapuram
Ramanathapuram District - Mandapam Block-TN14-61R-PERIODIC RENEWAL OF PMGSY ROADS UNDER PMGSY PERFORMANCE INCENTIVE GRANT 2023-24-Renewal of the road from Perunkulam - AD Colony (Using waste plastic)(0/0-1/290)
2024_RDTN_134868_1
DIPR/1942/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
As per the Tender DOcument
4 documents required · 4 mandatory
₹0
₹53,000
DRDA, Ramanathapuram
25 Sept 2024
24 Jun 2024
12 Jul 2024
24 Jun 2024
12 Jul 2024
24 Jun 2024
25 Jun 2024
Amount
Renewal of the Road from Perunkulam - AD Colony (using plastic waste) in KM 0/0-1/290
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal 0/0-1/0
Applying tack coat over BT surface (not treated with primer) using 2.50 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 43 A.
Supply and fixing of HM stone SI No. 44 A
Provision for Sign board
Provision for MS Name Board.
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SURESH KANNAN
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .