Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LQualified Make: VIDEOCON
Model: VIDEOCON & V2SM53.WV1-QDL CHANDRASEKHARPUR BHUBANESWAR ODISHA 751016 INDIA | KHORDHA | ODISHA | 751016 | Make: VIDEOCON
Model: VIDEOCON & V2SM53.WV1-QDL | L1 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
9 Jun 2018, 3:00 pmClosed
Air Conditioner Average Turn Over of Last 3 Years 5000000 Lakh (s) Experience with Gov. Required 5 Year (s) Air Conditioner ( 10 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Non- Inverter (Fixed Speed) Inverter (Variable Speed)
Non- Inverter (Fixed Speed) Nominal cooling capacity in Ton (kcal/hr) 1.5 Ton/4500 kcal/hr 1.5 Ton/4500 kcal/hr Coil Material Copper Aluminium
Copper Eco-friendly refrigerant true Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 5 metre - Packing LIst INDOOR UNIT
OUTDOOR UNIT
INSTALLATION KIT
REMOTE BATTERIES
MANUAL - 1/3 Any other Features Energy Rating: 3 Star Rating (2018). Note that as per Bureau of Energy Efficiency (BEE)
there is 2 point energy rating drop in 2018 for non-inverter split ACs. E.g. a 2017 5 star non-inverter split AC will become 3 star in 2018. Split AC: 1.5 ton capacity Panel Display: Digital Remote Control: LCD Temperature Control: Thermistor Air Direction: 4 way air deflection Speed Setting: 4/3 - CONFORMITY CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest - WARRANTY Warranty on Machine 1 1
2
3
4
5 Warranty on Compressor 5 5
6
7
8
9
10 INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Arbind Kumar 121001
Municipal Corporation Faridabad
BK CHOWK
NIT FARIDABAD 10 15 EMD Required No ePBG Required No
178256
GEM/2018/B/25400
Air Conditioner
15 days
Haryana; Faridabad
PRODUCT
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Air Conditioner Average Turn Over of Last 3 Years 5000000 Lakh (s) Experience with Gov. Required 5 Year (s) Air Conditioner ( 10 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC High wall Split AC Technology of AC Non- Inverter (Fixed Speed) Inverter (Variable Speed) | - | - | - |
| Non- Inverter (Fixed Speed) Nominal cooling capacity in Ton (kcal/hr) 1.5 Ton/4500 kcal/hr 1.5 Ton/4500 kcal/hr Coil Material Copper Aluminium | - | - | - |
| Copper Eco-friendly refrigerant true Minimum length of copper pipe and suitable connecting electrical cable for installation and commissioning 5 metre - Packing LIst INDOOR UNIT | - | - | - |
| OUTDOOR UNIT | - | - | - |
| INSTALLATION KIT | - | - | - |
| REMOTE BATTERIES | - | - | - |
| MANUAL - 1/3 Any other Features Energy Rating: 3 Star Rating (2018). Note that as per Bureau of Energy Efficiency (BEE) | - | - | - |
| there is 2 point energy rating drop in 2018 for non-inverter split ACs. E.g. a 2017 5 star non-inverter split AC will become 3 star in 2018. Split AC: 1.5 ton capacity Panel Display: Digital Remote Control: LCD Temperature Control: Thermistor Air Direction: 4 way air deflection Speed Setting: 4/3 - CONFORMITY CERTIFICATION BEE Star Rating 5 5 Conformity to Indian Standard IS 1391 latest - WARRANTY Warranty on Machine 1 1 | - | - | - |
| 2 | - | - | - |
| 3 | - | - | - |
| 4 | - | - | - |
| 5 Warranty on Compressor 5 5 | - | - | - |
| 6 | - | - | - |
| 7 | - | - | - |
| 8 | - | - | - |
| 9 | - | - | - |
| 10 INSTALLATION Installation and commissioning With Installation and Commissioning With Installation and Commissioning * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Arbind Kumar 121001 | - | - | - |
| Municipal Corporation Faridabad | - | - | - |
| BK CHOWK | - | - | - |
| NIT FARIDABAD 10 15 EMD Required No ePBG Required No | - | - | - |
Exempted
9 Jun 2018
6 Jun 2018
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_178256.pdf
GEM_BID
termsCondition.pdf
OTHER
2657c7ca70287299b5181580fdb5a7ab.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .