Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
14 Jul 2026, 6:00 pm6d left
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_314753_15
2nd TIME e-NIT No. 19 REW UDHAMPUR of 2026-27 Dated 06-07-2026
Open Tender
Civil Works
90 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹6,000
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of Sign Board | 1 | No. | 5,000 | ₹5,000 |
| 2 | Dimolishing RCC work by mechanical means and stockpiling designated location and disposal dismantled materials upto a lead of 1 km , stacking serviceable/unserviceable material separately including cutting reinforced bars | 3.64 | Sqm | 2,048.7 | ₹7,457.27 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 11.2 | cum | 479.3 | ₹5,368.16 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.36 | cum | 4,826.5 | ₹6,564.04 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 5.94 | cum | 5,733.6 | ₹34,057.58 |
| 6 | Providing labour for cleaning of existing drain by engaging 2 labourers for 1 day | 2 | cum | 900 | ₹1,800 |
| 7 | P/L RCC works (1 cement : 1.5 fine sand :3 graded crushed stone aggregates) using 20 mm n/s agg and curing complete excluding cost of shuttering upto p/level | 6.5 | cum | 7,788.4 | ₹50,624.6 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 20 | Sqm | 286.35 | ₹5,727 |
| 9 | Cetring and shuttering for soffit of slab : | 29.4 | Sqm | 718.2 | ₹21,115.08 |
| 10 | Cetring and shuttering for edgesof slab : | 110 | Sqm | 262 | ₹28,820 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1019421.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid