| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Less than the eastimate value |
| 2 | L2₹7.2 L+₹8,374.87 (1.18%)Rejected-AOC | ₹7.2 L+₹8,374.87 (1.18%) | L2 | Rejected-AOC Less than the eastimate value |
| 3 | L3₹7.3 L+₹16,372.44 (2.30%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹7.3 L+₹16,372.44 (2.30%) | L3 | Rejected-AOC Less than the eastimate value |
| 4 | L4₹7.6 L+₹51,319.87 (7.22%)Rejected-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹7.6 L+₹51,319.87 (7.22%) | L4 | Rejected-AOC Less than the eastimate value |
| 5 | L5₹8.0 L+₹86,178.87 (12.1%)Rejected-AOC | ₹8.0 L+₹86,178.87 (12.1%) | L5 | Rejected-AOC Less than the eastimate value |
| Sl No | Description | Qty | Unit | M/s.MS ENGINEERS AND BUILDERS L4 | M.S.& CO L2 | mookambika constructions L6 | GANAPATHY ENTERPRISES L5 | C BALASUBRAMANIAN L3 | MJ Infrastructures L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation complete direction as per the departmental officers | 577 | m3 | 100 ₹57,700 | 104.06 ₹60,042.62 | 147 ₹84,819 | 89 ₹51,353 Lowest | 105.21 ₹60,706.17 | 102.85 ₹59,344.45 |
| 2.00 | Providing,laying spreading and compacting WetMix Macadam with clean crushed,grade d aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the engineer. | 81 | m3 | 2,000 ₹1,62,000 Lowest | 2,374.5 ₹1,92,334.5 | 2,400 ₹1,94,400 | 2,670 ₹2,16,270 | 2,401.32 ₹1,94,506.92 | 2,346.88 ₹1,90,097.6 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 1,072 | m2 | 110 ₹1,17,920 | 94.6 ₹1,01,411.2 | 70 ₹75,040 Lowest | 100 ₹1,07,200 | 95.66 ₹1,02,547.52 | 93.5 ₹1,00,232 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,072 | m2 | 28 ₹30,016 | 24.08 ₹25,813.76 | 40 ₹42,880 | 26 ₹27,872 | 24.35 ₹26,103.2 | 23.8 ₹25,513.6 Lowest |
| 5.00 | Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications | 20 | m2 | 37 ₹740 | 31.82 ₹636.4 | 120 ₹2,400 | 27 ₹540 Lowest | 29.15 ₹583 | 31.45 ₹629 |
| 6.00 | Providing and laying of 25mm compacted thick Semidence Bituminous Concrete using 0.10m3 of 11.2mm IRC metal/ 0.16m3 of 6.7mm IRC metal and 0.11 m3 of 2.8mm and below with 24 kgs of bitumen of grade 60/70 for premixing per 10 m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 25mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, power finisher power rollers and all another tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 511 of MOST specification. | 1,092 | m2 | 361 ₹3,94,212 | 310.81 ₹3,39,404.52 | 380 ₹4,14,960 | 361 ₹3,94,212 | 314.28 ₹3,43,193.76 | 307.19 ₹3,35,451.48 Lowest |
| 7.00Add :- GST @ 18% | |||||||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
29 Jun 2026, 3:00 pmClosed
Asst Commissioner
East Zone Singanallur-641005
Restoration of BT Surface at Kalapatti areas in Ward No-8 East Zone
2026_MAWS_681272_5
E3/2026/EZ
Open Tender
Civil Works - Roads
Item Rate
East Zone Singanallur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
17 Sept 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation complete direction as per the departmental officers | 577 | m3 | - | - |
| 2 | Providing,laying spreading and compacting WetMix Macadam with clean crushed,grade d aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the engineer. | 81 | m3 | - | - |
| 3 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 1,072 | m2 | - | - |
| 4 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 1,072 | m2 | - | - |
| 5 | Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications | 20 | m2 | - | - |
| 6 | Providing and laying of 25mm compacted thick Semidence Bituminous Concrete using 0.10m3 of 11.2mm IRC metal/ 0.16m3 of 6.7mm IRC metal and 0.11 m3 of 2.8mm and below with 24 kgs of bitumen of grade 60/70 for premixing per 10 m2 including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity conveying the mix by tipper trucks to power site spreading the mix in required temperature for uniform thickness of 25mm with mechancial paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire chrages and fuel charges for 20-30 T CMP with bitumen boiler, tipper trucks, power finisher power rollers and all another tools and plant required including all other incidental charges etc., completed as per specification using cmp clause 511 of MOST specification. | 1,092 | m2 | - | - |
| 7 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Roads.pdf
Tender Documents • 0.51 MB
BOQ_818713.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .