| 1 | L1₹2.0 CrAccepted-AOC K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹2.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 Cr+₹1.2 Cr (62.0%)Rejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹3.2 Cr+₹1.2 Cr (62.0%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical PLOT NO 1080 LEVEL 21 AND 22 BIRLA AURORA DR ANNIE BEASANT ROAD MUMBAI MUMBAI MAHARASHTRA 400030 | MUMBAI | MAHARASHTRA | 400030 | - | - | Rejected-Technical Firm has not quoted rate for tender schedule item No.10 and has not accepted all the MPPGCL standard terms and conditions of the tender and offered several techno commercial deviations w.r.t. MPPGCL tendered terms and conditions. |
| Sl No | Description | Qty | Unit | EM Services (I) Pvt. Ltd. | GE POWER INDIA LIMITED |
|---|---|---|---|---|---|
| 1.00 | Bearing Inspection & Generatl Overhauling work including Couling Alignment, Casing Centring and Boroscopic Inspection including EOT Crane Operators | 1 | LS | 32,20,000 ₹37,99,600 | 27,59,913 ₹32,56,697.34 Lowest |
| 2.00Overhauling of LP Turbine | |||||
| 2.01 | Overhauling of LP Turbine | 1 | LS | 28,50,000 ₹33,63,000 | 24,21,000 ₹28,56,780 Lowest |
| 2.02 | LP Turbine last two stages (3L & 3R and 2L & 2R) Blades Removal, Cleaning and NFT | 1 | set | 2,45,000 ₹2,89,100 Lowest | 4,00,000 ₹4,72,000 |
| 2.03 | LP Turbine last two stages (3L & 3R and 2L & 2R) Blades MPI | 1 | set | 2,25,000 ₹2,65,500 | 2,00,000 ₹2,36,000 Lowest |
| 2.04 | Installation of LP Turbine last two stages (3L & 3R and 2L & 2R) Blades | 1 | set | 2,10,000 ₹2,47,800 Lowest | 3,00,000 ₹3,54,000 |
| 3.00Overhauling of Hydraulically Operated Valves | |||||
| 3.01 | ESV & HP Control Valves | 4 | Nos | 5,20,000 ₹6,13,600 | 3,87,000 ₹4,56,660 Lowest |
| 3.02 | IV & IP Control Valves | 4 | Nos. | 5,20,000 ₹6,13,600 | 3,87,000 ₹4,56,660 Lowest |
| 3.03 | CRH NRV | 1 | Nos | 1,00,000 ₹1,18,000 | 81,000 ₹95,580 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
9 May 2025, 3:00 pmClosed
SE PNW
O/o CE Gen Sarni
Overhauling work of LP Turbine associated works and overhauling of 250 MW BHEL make Generator Exciter and associated works of unit no 11 of 2 250 MW PH 4 STPS Sarni
2025_MPPGC_398013_1
WE360
Limited
Miscellaneous Works
Fixed-rate
30 days
Sarni
As per NIT
9 documents required · 9 mandatory
₹0
₹2.1 L
Yes
9 Oct 2025
29 Jan 2025
13 May 2025
29 Jan 2025
9 May 2025
29 Jan 2025
Bearing Inspection & Generatl Overhauling work including Couling Alignment, Casing Centring and Boroscopic Inspection including EOT Crane Operators
Overhauling of LP Turbine
Overhauling of LP Turbine
LP Turbine last two stages (3L & 3R and 2L & 2R) Blades Removal, Cleaning and NFT
LP Turbine last two stages (3L & 3R and 2L & 2R) Blades MPI
Installation of LP Turbine last two stages (3L & 3R and 2L & 2R) Blades
Overhauling of Hydraulically Operated Valves
ESV & HP Control Valves
IV & IP Control Valves
CRH NRV
HPBP Steam Control Valves & HPBP Spray Control Valves
IOverhauling of Extraction NRV/Valve
Overhauling of MS Strainer / HRH Strainer
Checking & Setting of Critical Piping Hanger & Support from Boiler to Turbine End
Overhauling of MOT Coolers
Overhauling of Feed Valves
Generator Shaft Seal Inspection
IWork of calibration, adjustment, and tuning of TG site C&I system with max DNA DCS system during AOH
Generator Rotor Thread Out
Exciter Maintenance
Generator Hydrogen Cooler Maintenance & Exciter Cooler Maintenance
Attending Lekage if found during Generator Rotor Gas Tightness Test
Testing of Generator (Online Testing on Generator :- Online testing of Generator shall be carried out before shut down of unit and after COH of Unit and results shall be compare for improvement)
Vibration Measurement
Noise Measurement
Thermography test
Partial discharge Measurement
Testing of Generator (Offline Testing)
Stator Winding Resistance
Resistance and Impedance of Generator Rotor & Exciter Rotor
IR Test of Gen Stator, Rotor and Exciter Stator, Rotor
ELCID test of Generator Stator
NFT of Generator Stator Winding
Boroscopic/Microscopic Test
Tan Delta Test of Stator Winding (Upto 10 KV)
DC Hipot of Stator (if Required)
RSO Test of Generator Rotor
Optional Work:
Re-Finning of any Stage of LPT Casing (Rate is to be quoted on per stage basis (one no. means for 01 complete stage of any side)
Generator Seal Oil System
Vibration Analysis & Trim Balancing
Seat Repairing / Replacement of HP Control valve
Seat Replacement of HP Bypass Valve
Seat Repairing / Replacement of Feed Valve
Additional TG Baring Replacement (if more than 01 bearing needs to be replaced & if lifting of Generator End Shield is already included and to be carried out in Generator Overhauling work)
Additional TG Baring Replacement For Bearing No. 05/06 Only ( if more than 01 bearing needs to be replaced & if lifting of Generator End Shield is not included in Generator Overhauling work)
Replacement of Addition LPT Extraction Bellow (Except A-3 xtraction Bellow i.e. LPH-1 Extraction bellow)
Cutting & Machinig work on Generator Shaft & Rotor Earth Fault Slip Rings
In situ machining without balancing
Machining and slow speed balancing
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .