Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC GUDHALA VILL NANGLA DUDOLI PUNHANA 1225 8 2025R23859 | PUNHANA | NUH | HARYANA | 122508 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹20.2 L+₹68,114.92 (3.49%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹20.6 L+₹1.1 L (5.57%)Rejected-AOC | L3 | Rejected-AOC Reject | |
| 4 | Not Admitted-Fee/PreQual/Technical VILL PUNHANA GUD MANDI PUNHANA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.7 L
EMD Value
₹35,380
Closing Date
2 Mar 2026, 5:00 pmClosed
Manish Sehrawat
Municipal Committee Punhana
Construction of IPB Revenue Road and Drain Patakpur Road to Anaj Mandi Boundary in MC Punhana
2026_HRY_504437_1
20260234ED4E 61C4 4F00 B20A FC24ADEAD6B1340ULB
Open Tender
Civil Works
Works
220 days
MC Punhana
2 documents required · 2 mandatory
₹1,000
Yes
₹35,380
Yes
30 Mar 2026
21 Feb 2026
3 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
21 Feb 2026 - 2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate] | 108.04 | cum | 911 | ₹98,424.44 |
| 2 | [17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | 203.46 | cum | 1,038 | ₹2,11,191.48 |
| 3 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 864.3 | Sqm | 7 | ₹6,050.1 |
| 4 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | 763.57 | cum | 184 | ₹1,40,496.88 |
| 5 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 1,238.5 | Sqm | 655 | ₹8,11,217.5 |
| 6 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 135 | Sqm | 26 | ₹3,510 |
| 7 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | 620 | Metre | 160 | ₹99,200 |
| 8 | [4.7.1.2]Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth and lift up to 1.5 m, as directed by Engineer-in- Charge: 1.2. All kinds of soil 15 m lead [Through Rate] | 118.68 | Sqm | 38 | ₹4,509.84 |
| 9 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 92.05 | cum | 4,287 | ₹3,94,618.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_583145.xls
BOQ • 0.29 MB
CCP.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .