Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.5 LAccepted-Finance MAIN STREET GONDER 35 VILL GONDER KARNAL HARYANA 132024 | KARNAL | KARNAL | HARYANA | 132024 | ₹60.5 L | L1 | Accepted-Finance Low Rate Quoted. |
| 2 | L2₹60.9 L+₹40,240 (0.67%)Rejected-Finance SONARI TOWN WARD NO 3 P O SONARI DISTRICT SIVASAGAR | SONARI | SIVASAGAR | ASSAM | ₹60.9 L+₹40,240 (0.67%) | L2 | Rejected-Finance High Rate Quoted. |
| 3 | L3₹62.7 L+₹2.2 L (3.64%)Rejected-Finance | ₹62.7 L+₹2.2 L (3.64%) | L3 | Rejected-Finance High Rate Quoted. |
| 4 | L4₹72.6 L+₹12.1 L (20.0%)Rejected-Finance | ₹72.6 L+₹12.1 L (20.0%) | L4 | Rejected-Finance High Rate Quoted. |
| 5 | L5₹78.9 L+₹18.4 L (30.4%)Rejected-Finance PLOT NO LB 137 PHASE 2 BHIMATANGI PS AIRFIELD BHUBANESWAR DIST KHURDA ODISHA 751002 | BHUBANESWAR | KHURDA | ODISHA | 751002 | ₹78.9 L+₹18.4 L (30.4%) | L5 | Rejected-Finance High Rate Quoted. |
| Sl No | Description | Qty | Unit | sanjay kalita L4 | Dipankar Choudhury L3 | Nabalok Das L5 | PABITRA SAIKIA L2 | Pavee Construction L1 | B.M. ADISON PROJECTS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of Granular Sub-base by providing river bed graded river pebbles along with mixing graded aggregate mix to achieve the desired gradation for all leads and lifts, spreading in uniform layers of specified thickness on prepared surface, watering and compacting with earth rammers or suitable compactors of sufficient capacity to achieve required design field density at OMC all complete as per direction and satisfaction of Engineer-in-charge.
(Note: - Please read the Technical specifications of the item on before quoting). | 810 | Cum | 2,500 ₹20,25,000 | 1,700 ₹13,77,000 | 3,400 ₹27,54,000 | 1,680 ₹13,60,800 Lowest | 2,500 ₹20,25,000 | 1,700 ₹13,77,000 |
| 2.00 | Supplying, laying, speading & compacting sand in uniform thickness with three wheeled vibratory/raod roller of 8-10 tonnes capacity, for all height and depth etc. including compaction, carriage of material to work site, for all leads & lifts etc all complete as per directions & satisfaction of Engineer-in-charge. | 810 | Cum | 900 ₹7,29,000 Lowest | 1,024.69 ₹8,29,998.9 | 1,800 ₹14,58,000 | 1,400 ₹11,34,000 | 1,250 ₹10,12,500 | 1,700 ₹13,77,000 |
| 3.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 44 | Cum | 2,500 ₹1,10,000 | 2,500 ₹1,10,000 | 1,200 ₹52,800 Lowest | 2,480 ₹1,09,120 | 1,500 ₹66,000 | 2,434.25 ₹1,07,107 |
| 4.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 10 | Cum | 3,500 ₹35,000 | 10,000 ₹1,00,000 | 1,500 ₹15,000 Lowest | 2,490 ₹24,900 | 1,500 ₹15,000 Lowest | 3,551.25 ₹35,512.5 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil | 810 | Cum | 250 ₹2,02,500 | 351.85 ₹2,84,998.5 | 200 ₹1,62,000 | 105 ₹85,050 | 100 ₹81,000 Lowest | 177.5 ₹1,43,775 |
| 6.00 | Consolidation of sub grade with power road roller of sufficient capacity to attain the maximum density including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. all complete as per satisfaction and Direction of Engineer-in-charge. | 5,400 | Sqm | 200 ₹10,80,000 | 51.85 ₹2,79,990 | 90 ₹4,86,000 | 152 ₹8,20,800 | 10 ₹54,000 Lowest | 148.14 ₹7,99,956 |
| 7.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 55 | Cum | 400 ₹22,000 | 4,236.36 ₹2,32,999.8 | 200 ₹11,000 Lowest | 244 ₹13,420 | 500 ₹27,500 | 263.95 ₹14,517.25 |
| 8.00 | Grading of basic strip of Runway from the ground including removing vegetation and inequalities not exceeding average15cm deep as per the the garding requirements of Civil aviation CAR section 3.4.13 & 3.4.15 using motorized grader/dozer by cutting and filling in 20 cm layers watering and compacting with vibratory roller to obtain desired compacted density as per morth specifications and as per directions of engineer in charge. The work involves taking initial levels and plotting the finished level as per requirement of CAR section 3.4.13 & 3.4.15 and then grading the surface as per the approved gradient.The cut area and filled area should be compacted to desired density as approved by engineer in charge using vibratory roller of 8 to 10 tonnes.vibratory Rollers of smaller widths should be used for areas where bigger rollers can't used. If exra earth is obtained in any sector area,the same to be carried to areas where shortage of earth is there for filling and nothing extra shall be paid for the same. How ever for areas earth is to be brought from borrow pits from outside the AAI premises, the same will be delt under separate item. | 2,375 | Sqm | 300 ₹7,12,500 | 242.58 ₹5,76,127.5 | 150 ₹3,56,250 | 90 ₹2,13,750 Lowest | 100 ₹2,37,500 | 252.63 ₹5,99,996.25 |
| 9.00 | Supplying and Banking with good earth obtained from approved quarry (within radius of 10km) in embankment or depression in layers not exceeding 20cm in depth, breaking clods/ over size material, removal of stumps/roots and the like & watering, grading/levelling each layer with dozers/grader and rolling every layer with vibratory roller/ earth compactor of minimum 8-12 tonnes capacity to achieve Min 95% relative compaction (field density) ( as per IS 2720 part VIII) and dressing to the required grade, camber and slope complete as per MoRth specifications and direction of Engineer-in-charge. (The item included cost of wotk, payment of necessary royalty, carriage of good earth upto work site for all leads and lifts involved. Plasticity Index (PI) of the good earth shall not be more than 8, payment to be made for compacted quantity only). | 4,965 | Cum | 350 ₹17,37,750 Lowest | 402.82 ₹20,00,001.3 | 495 ₹24,57,675 | 458 ₹22,73,970 | 500 ₹24,82,500 | 759.53 ₹37,71,066.45 |
| 10.00 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 219 | Cum | 2,500 ₹5,47,500 | 1,689.5 ₹3,70,000.5 | 400 ₹87,600 | 70 ₹15,330 Lowest | 100 ₹21,900 | 420.8 ₹92,155.2 |
Tender Value
₹92.9 L
EMD Value
₹2.8 L
Closing Date
2 Jun 2026, 12:00 pmClosed
SM(Engg-Civil)
Office of SM(Engg-Civil), Airports Authority of India, Dibrugarh Airport
Extension of RESA 05 at Dibrugarh Airport
2026_AAI_277333_1
AAI/DIB/E-C/e-NIT/Extension of Resa/ 26-27
Open Tender
Civil Works
Item Rate
120 days
Dibrugarh Airport
Please refer Tender Document.
13 documents required · 13 mandatory
₹1,180
₹2.8 L
23 Jun 2026
13 May 2026
3 Jun 2026
13 May 2026
2 Jun 2026
13 May 2026
13 May 2026 - 20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Granular Sub-base by providing river bed graded river pebbles along with mixing graded aggregate mix to achieve the desired gradation for all leads and lifts, spreading in uniform layers of specified thickness on prepared surface, watering and compacting with earth rammers or suitable compactors of sufficient capacity to achieve required design field density at OMC all complete as per direction and satisfaction of Engineer-in-charge.
(Note: - Please read the Technical specifications of the item on before quoting). | 810 | Cum | 100 | ₹81,000 |
| 2 | Supplying, laying, speading & compacting sand in uniform thickness with three wheeled vibratory/raod roller of 8-10 tonnes capacity, for all height and depth etc. including compaction, carriage of material to work site, for all leads & lifts etc all complete as per directions & satisfaction of Engineer-in-charge. | 810 | Cum | 10 | ₹8,100 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 44 | Cum | 10 | ₹440 |
| 4 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 10 | Cum | 10 | ₹100 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge.
All kinds of soil | 810 | Cum | 10 | ₹8,100 |
| 6 | Consolidation of sub grade with power road roller of sufficient capacity to attain the maximum density including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. all complete as per satisfaction and Direction of Engineer-in-charge. | 5,400 | Sqm | 10 | ₹54,000 |
| 7 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 55 | Cum | 10 | ₹550 |
| 8 | Grading of basic strip of Runway from the ground including removing vegetation and inequalities not exceeding average15cm deep as per the the garding requirements of Civil aviation CAR section 3.4.13 & 3.4.15 using motorized grader/dozer by cutting and filling in 20 cm layers watering and compacting with vibratory roller to obtain desired compacted density as per morth specifications and as per directions of engineer in charge. The work involves taking initial levels and plotting the finished level as per requirement of CAR section 3.4.13 & 3.4.15 and then grading the surface as per the approved gradient.The cut area and filled area should be compacted to desired density as approved by engineer in charge using vibratory roller of 8 to 10 tonnes.vibratory Rollers of smaller widths should be used for areas where bigger rollers can't used. If exra earth is obtained in any sector area,the same to be carried to areas where shortage of earth is there for filling and nothing extra shall be paid for the same. How ever for areas earth is to be brought from borrow pits from outside the AAI premises, the same will be delt under separate item. | 2,375 | Sqm | 10 | ₹23,750 |
| 9 | Supplying and Banking with good earth obtained from approved quarry (within radius of 10km) in embankment or depression in layers not exceeding 20cm in depth, breaking clods/ over size material, removal of stumps/roots and the like & watering, grading/levelling each layer with dozers/grader and rolling every layer with vibratory roller/ earth compactor of minimum 8-12 tonnes capacity to achieve Min 95% relative compaction (field density) ( as per IS 2720 part VIII) and dressing to the required grade, camber and slope complete as per MoRth specifications and direction of Engineer-in-charge. (The item included cost of wotk, payment of necessary royalty, carriage of good earth upto work site for all leads and lifts involved. Plasticity Index (PI) of the good earth shall not be more than 8, payment to be made for compacted quantity only). | 4,965 | Cum | 10 | ₹49,650 |
| 10 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 219 | Cum | 10 | ₹2,190 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
TD.pdf
Tender Documents • 24.41 MB
BOQ_323964.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .