Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25 LAccepted-AOC | ₹25 L Quoted ₹23.8 L | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹33.5 L+₹9.8 L (41.1%)Rejected-Finance | ₹33.5 L+₹9.8 L (41.1%) | L2 | Rejected-Finance Other than L1 bidder |
| 3 | L3₹34 L+₹10.3 L (43.2%)Rejected-Finance NEAR ALCHI MONESTRY 00 01 SKANTSO ALCHI SASPOL ALCHI LEH LADAKH PIN 194106 | LEH LADAKH | LADAKH | 194106 | ₹34 L+₹10.3 L (43.2%) | L3 | Rejected-Finance Other than L1 bidder |
| 4 | L3₹34 L+₹10.3 L (43.2%)Rejected-Finance | ₹34 L+₹10.3 L (43.2%) | L3 | Rejected-Finance Other than L1 bidder |
| 5 | L4₹34.0 L+₹10.3 L (43.2%)Rejected-Finance | ₹34.0 L+₹10.3 L (43.2%) | L4 | Rejected-Finance Other than L1 bidder |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
20 Apr 2026, 6:00 pmClosed
GE (AF) Thoise
GE (AF) Thoise PIN 937219 c/o 56 APO
TERM CONTRACT FOR ARTIFICERS WORK AT AF STN BASE CAMP UNDER GE (AF) THOISE
2026_MES_758380_1
8103/E8
Open Tender
Civil Works
Item Rate
365 days
Thoise
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Thoise
₹50,000
Yes
17 Aug 2026
30 Mar 2026
22 Apr 2026
30 Mar 2026
20 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Contractor to insert here-in- below their rate percentage by opting Less or Excess option for below or above the rates contained in MES SSR-2020 (Part II) rates. If net schedule rates are offered at PAR with MES Schedule, '0' should be inserted in percentage box. The Less/ Excess percentage inserted by the bidder here-in-below shall be deemed firm. The contractor shall be allowed to insert the percentage only upto two decimal places.
Note:- (i) Irrespective of amount generated in BOQ template. The net contract sum shall be as shown in Appendix 'A' to Notice of e-tender.
(ii) Total work orders amount (including quoted percentage) will not be increased from the estimated cost of work. | - | As per SSR Part II (2020) | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
8103Tender.pdf
Tender Documents • 1.17 MB
BOQ_849448.xls
BOQ • 0.23 MB
8103corrigendum.pdf
PDF • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .