Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹44.9 LAccepted-AOC FARIDABAD FARIDABAD HARYANA | L-1 | Accepted-AOC ok | |
| 2 | L-2₹46.2 L+₹1.3 L (2.99%)Rejected-Finance | L-2 | Rejected-Finance No | |
| 3 | L-3₹49.3 L+₹4.4 L (9.83%)Rejected-Finance 3701 3701 NEAR SAINI HOSPITAL UKLANA ROAD BHUNA 125111 | FATEHABAD | HARYANA | 125111 | L-3 | Rejected-Finance No | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | The Sinthla Coop LC Society Ltd L3 | SURENDER KUMAR CONTRACTOR L1 | The Panvi Dangi CO-OP L & C Society Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00NS items | ||||||
| 1.01 | Supply of cable complete with necessary connections 16 sqmm 4 core armaured cable Complete. | 50 | Per Metre | 170 ₹8,500 | 150 ₹7,500 Lowest | 200 ₹10,000 |
| 1.02 | S/E of 45 watt LED street light fitting, potted driver, toughened glass and aluminium dia cast body (Philips/ Bajaj/ Crompton/ Wipro/ Havells/ Halonix/ Surya) make including making necessary connetions. | 4 | Each | 4,200 ₹16,800 | 2,387 ₹9,548 Lowest | 2,850 ₹11,400 |
| 1.03 | S/E of Split A.C. 2.0 Ton 5 star (Lloyed/ Voltas/ Blue Star/Diakin) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 49,500 ₹49,500 | 47,720 ₹47,720 Lowest | 65,000 ₹65,000 |
| 1.04 | S/E of copper pipe for split Air Conditioner (A.C.) including making necessary connections and all patty material required to complete the job in all respect. | 6.09 | Metre | 1,500 ₹9,135 | 800 ₹4,872 | 200 ₹1,218 Lowest |
| 1.05 | S/E of PVC Drain Pipe for split A.C. including making necessary connections and all patty material required to complete the job in all respect. | 9.14 | Metre | 120 ₹1,096.8 | 147 ₹1,343.58 | 100 ₹914 Lowest |
| 1.06 | S/E of 20 watt LED tube light fitting (Philips/Bajaj/Crompton/Wipro/Havells/Surya) make including all patty material required to complete the job in all respect. | 20 | Each | 280 ₹5,600 | 199 ₹3,980 Lowest | 300 ₹6,000 |
| 1.07 | S/E of split A.C. 1.5 Ton 5 star (Lloyed/Voltas/Blue Star/Diakin) make including making necessary connections and all patty material required to complete the job in all respect. | 1 | Each | 42,000 ₹42,000 | 36,000 ₹36,000 Lowest | 45,000 ₹45,000 |
Tender Value
₹46.8 L
EMD Value
₹93,640
Closing Date
9 Sept 2025, 3:00 pmClosed
VIJAY KUMAR
XEN Zila Parishad Bhiwani
Const. of Sub Health Centre Village -Barsi Gujran Block -Bawani Khera Re Tender
2025_HRY_469658_1
20255AE5A8C1 018F 4EF0 A67B CC70B6D798C32164DEV
Open Tender
Civil Works
Works
270 days
BARSI GUJRAN
2 documents required · 2 mandatory
₹5,000
₹93,640
Yes
29 Oct 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .