Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC KANDRA COLLIERY ANDAL BURDWAN PASCHIM BARDHAMAN WEST BENGAL 713321 INDIA | ANDAL | PASCHIM BARDHAMAN | WEST BENGAL | 713321 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹1.8 L+₹2,902.80 (1.60%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹1.9 L+₹7,788 (4.30%)Rejected-Finance BANKOLA AREA BANKOLA AREA OFFICE P O UKHRA DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713363 | UKHRA | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L3 | Rejected-Finance TC recommendation | |
| 4 | L4₹1.9 L+₹13,902.76 (7.68%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L4 | Rejected-Finance TC recommendation |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
19 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Lowering of 02(Two) nos. (30 ft) of Guide rope (32mm dia.) at North East position of North side cage and North West position of North cage at No 3 Pit of NKJ Unit Khandra Colliery
2023_ECL_290618_1
ECL/GM/BA/E TENDER/23-24/EnM/106 Dt. 09.10.2023
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Khandra Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,300
23 Dec 2023
9 Oct 2023
20 Oct 2023
9 Oct 2023
19 Oct 2023
9 Oct 2023
9 Oct 2023 - 13 Oct 2023
Amount
Item Description/ Heading
Lowering of (30 ft) guide rope (32mm) dia. From surface & lowering through shaft, cutting 30 ft damaged guide rope
Patch cleaning of pit bottom sump & Clamping, dewatering
Fixing of clamp with guide rope at pit & pit bottom
Tensioning & tightening of guide rope
Hand crane shifting from at VK unit to NKJ & jamming at NKJ unit
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ
HAREKRISHNA ENTERPRISE
SWAPAN KUMAR AKHULI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .