| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.4 LAccepted-Finance GOVERNMENT CONTRACTOR VILLAGE PO TEHSIL NURPUR DISTT KANGRA HP | 1 | Accepted-Finance accepted | |
| 2 | 2₹26.1 L+₹2.7 L (11.7%)Rejected-Finance INDORA HIMACHAL PRADESH HP | KULLU | HIMACHAL PRADESH | 172001 | 2 | Rejected-Finance Rejected |
Tender Value
₹30.0 L
EMD Value
₹59,900
Closing Date
13 Feb 2026, 11:00 amClosed
Executive Engineer
HPPWD Division Chowari
P/L 30mm thick bituminous concrete in Km. 1/00 to 3.150).
2026_PWD_127571_9
NIT No. 11878-11930 dated 03.02.2026
Open Tender
Civil Works
Percentage
60 days
Chowari
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,500
₹59,900
11 Mar 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. as per the entire statisfaction and direction of Engineer-in-charge including carriage of materials within all leads and lifts and other incidental. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 Kg (zero point eighty five killograme) per square metre using mechanical means as per technical specification Clause 502 and as per direction of Engineer-In-Charge including carriage of materails with in all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying bituminous macadom with 40-60 TPH (forty- sixty tonne per hour) batch type HMP producing an average output of 75 (seventy five) tonnes per hour with using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% (Four point five ) per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignmernt , rolling with smooth wheel , vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No 505 complete in all respect and to the entire satisfaction of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect.The rate is inclusive of octroi, royality ,Malkana, toll tax ,GST or any other taxes imposed by the Government .
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg (zero point two hundred seventy five killograme) per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 and as per direction of Engineer-In-Charge including carriage of materails with in all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying 30mm (Thirty millimetre) compacted thick bituminous concrete with min 40-60 TPH (forty- sixty tonne per hour) hot mix batch type/drum type plant with electronic control Grading-II using crushed aggregate 13mm (Thirteen millimetre) nominal size of specified grading premixed with bituminous binder VG-10 (Viscosity Grade-ten) @ 5.50% (five decimal five zero percent) of mix weight transported to site, laid with censor paver finisher hydraulic with censor control to the required grade, level and alignment over a previously prepered surface and rolling complete with smooth wheeled roller 8-10 (Eight-Ten) tonne capacity for initial break down rolling and vibratory roller 8-10 (Eight-Ten) tonne capacity or pneumatic type roller of 12-15 (Twelve-fifteen Tonne) with tyre pressure of atleast 0.56mpa (Zero point five six ) for intermediate rolling and finish rolling with 6-8 (six-eight) tonne smooth wheeled tandom roller to achieve the desired compaction as per MORTH technical specification clause No. 509 and as per directions and entire satisfaction of the Engineer-in-Charge including carriage of material within all leads,lifts and other incidentals. The rates including Royality, Malkhana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government.
Providing and laying of hot applied thermoplastic compound paint 2.5mm (two point five millimeter) thick including reflectrosing glass beads @ 300 gms (three hundred grams) per square meter area , thickness of 2.5mm (two point five millimeters) of surface applied glass bead, all by road marking machine. The finished surface to be level, uniform and free from streaks and holes, complete as per IRC:35 and MORTH technical specification clause 803.4 including carriage of materials within all leads and lifts and other incidental.The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
sbd9.pdf
Tender Documents • 3.20 MB
BOQ_188483.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .