| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹24.4 L (15.2%)Rejected-Finance 4 91C BYPASS ROAD PUDUKOTTAI THOOTHUKUDI THOOTHUKUDI TUTICORIN THOOTHUKUDI TAMIL NADU 628103 | TUTICORIN | TAMIL NADU | 628103 | ₹1.8 Cr+₹24.4 L (15.2%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
30 Sept 2020, 3:00 pmClosed
Project Director DRDA Thoothukudi
O/O Project Director DRDA Thoothukudi
Thoothukudi District TNRRIS 2020-21- Improvements to 6 No of roads in Sathankulam Panchayat Union - Package No TN/TUT-07 -TNRRIS(2020-21)
2020_RDTN_180580_1
DRDPR,Chennai LrNo.DIPR/3344/Tender/20 dt.8.9.20
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹1.7 L
O/O Project Director DRDA Thoothukudi
3 Feb 2021
19 Sept 2020
30 Sept 2020
19 Sept 2020
30 Sept 2020
25 Sept 2020
23 Sept 2020
Amount
Strengthening of Kombankulam Road Road km 0/0-1/8 in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/8
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/8
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10
Strengthening of Kombamkulam - Vettairajankulam Road km 0/0-1/6 in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/6
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/6
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10
Renewal of Sankarankudiyiruppu Road Km 0/0 - 1/0 in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/1
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/1
Providing and Laying Red Gravel for soling & for side berms to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing Advance BT patches using 13.2 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 25 mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10 m
Kommadikottai - Puthantharuvai Road (Plastic Waste) in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/6
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/6
Providing and Laying Red Gravel for soling & for side berms to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing Advance BT patches using 13.2 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 25 mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen and 1.168 kgs of Pastic waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10 m
Renewal of Polaiyarpuram - Pudukudi Road Km0/0-1/500 in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/5
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/5
Providing and Laying Red Gravel for soling & for side berms to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing Advance BT patches using 13.2 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 25 mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10 m
Renewal BT of Pandarapuram - Sirapoor Road Km 0/0 - 2/8 in Sathankulam Block under TNRRIS 2020-21 of Package No.07
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-2/8
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-2/8
Providing and Laying Red Gravel for soling & for side berms to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing Advance BT patches using 13.2 mm IRC metal premixed with 44 Kg of bitumen including removal of failed material, trimming the sides to vertical and leveling the bottom, cleaning the same with compressed air or any appropriate method, filled with 25 mm thick BM, after applying bitumen emulsion tack coat at the bottom and sides as per technical specifications clause 502, 503 and 504.
Providing and laying tack coat over the BT surface using 3.00 Kg of Emulsion bitumen for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10 m
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
IMMANUEL AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .