| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | ₹23.7 L | L1 | Accepted-AOC Being L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
| Sl No | Description | Qty | Unit | T M CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Construction of control room building | ||||
| 1.01 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift up to 1.50 m. | 1,109.66 | Cum | 128 ₹1,42,036.48 Lowest |
| 1.02 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 107.83 | Cum | 128 ₹13,802.24 Lowest |
| 1.03 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 92.14 | Cum | 90 ₹8,292.6 Lowest |
| 1.04 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 9.6 | Cum | 90 ₹864 Lowest |
| 1.05 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 26.26 | Cum | 4,370 ₹1,14,778.05 Lowest |
| 1.06 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth | 10.22 | Cum | 6,970 ₹71,233.4 Lowest |
| 1.07 | Random rubble masonry with hard stone in foundations and plinth in cement mortar 1 : 6 (1 cement : 6 fine sand) including levelling up with cement concrete 1 : 6 : 12 (1 cement : 6 coarse sand :12 stone aggregate 20 mm nominal size) at plinth level | 11.43 | Cum | 2,600 ₹29,718 Lowest |
| 1.08 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 15.19 | Cum | 4,250 ₹64,536.25 Lowest |
| 1.09 | Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 17.63 | Cum | 2,450 ₹43,193.5 Lowest |
Tender Value
₹31.6 L
EMD Value
₹63,000
Closing Date
23 May 2025, 4:00 pmClosed
General Manager
NHPC Limited Dibang MUltipurpose project Roing
Construction of control room building for 33 or 0.433 KV substation at Right Bank near Dam site, Dibang Multipurpose Project, Arunachal Pradesh
2025_NHPC_856529_1
NH/DMP/PNC/NIT/2025/06
Open Tender
Civil Works
Works
150 days
Dibang MUltipurpose project
Please refer tender document
2 documents required · 2 mandatory
₹590
Yes
NHPC Limited
₹63,000
Yes
24 Aug 2026
12 Apr 2025
27 May 2025
12 Apr 2025
23 May 2025
12 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .