| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74.3 LAdmitted-Finance | -0.10% | ₹74.3 L | L1 | Admitted-Finance |
| 2 | L2₹76.3 L+₹1.9 L (2.60%)Admitted-Finance | +2.50% | ₹76.3 L+₹1.9 L (2.60%) | L2 | Admitted-Finance |
| 3 | L3₹76.8 L+₹2.5 L (3.30%)Admitted-Finance | +3.20% | ₹76.8 L+₹2.5 L (3.30%) | L3 | Admitted-Finance |
Tender Value
₹74.4 L
EMD Value
₹1.5 L
Closing Date
5 Jun 2026, 12:00 pmClosed
DG (ROADS)
Chaplin square, 5/1, Chowringhee place, Kol-13
REPAIRING OF DAMAGED ROAD AT ATABAGAN E BLOCK FROM JUNC OF BORAL MAIN RD TO 2,SARADA PARK AND ANANDASREE FROM NETAJI SANGHA TO B1,PRANTIK ABASAN IN WARD 111, BR XI
2026_KMC_1024477_1
KMC/ROADS/2025-2026/916
Open Tender
CIVIL WORKS
Percentage
90 days
ATABAGAN E BLOCK
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.5 L
Yes
20 Jun 2026
16 May 2026
8 Jun 2026
16 May 2026
5 Jun 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials.
(c) For average depth above 75 mm but not exceeding 150 mm by manual means:
(ii) Brick / Jhama metal surface. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.01 Page No.331) | 3,261.44 | SQUARE METER | 19 | ₹61,967.36 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume).
(a) For Fine Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3) | 97.49 | CUBIC METER | 1,400.03 | ₹1,36,486.12 |
| 3 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) For Construction of Sub Base by consolidating Brick Bats / Laterite (90 mm to 45 mm)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10 (ii) Page No.247 & page-222 sl. No-5 (f)) | 326.14 | CUBIC METER | 1,944.9 | ₹6,34,317.47 |
| 4 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 56.2 | CUBIC METER | 4,761 | ₹2,67,570.58 |
| 5 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 3,330.4 | EACH | 298.22 | ₹9,93,191.89 |
| 6 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)
and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 3,330.4 | EACH | 214.63 | ₹7,14,803.75 |
| 7 | SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(iii) 150 mm | 21.6 | METER | 334 | ₹7,214.4 |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 337.53 | SQUARE METER | 361 | ₹1,21,848.76 |
| 9 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(b) 1:4:8 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 3.39 | CUBIC METER | 4,566 | ₹15,484.22 |
| 10 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand)
( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e)) | 244.61 | CUBIC METER | 2,596.83 | ₹6,35,205.39 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
TENDERFORM916.pdf
Tender Documents • 0.87 MB
BOQ_2517741.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .