Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC low price | |
| 2 | L2₹3.0 L+₹121.29 (0.04%)Rejected-Finance | L2 | Rejected-Finance high price |
| Sl No | Description | Qty | Unit | Nisathkhan L1 | M. HAPEEP RAHMAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Toilet at Semmanampottal in Nerkuppai Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 1.42 | Cum | 131 ₹903.9 Lowest | 131.89 ₹910.04 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 0.44 | Cum | 6,224 ₹18,672 Lowest | 6,224.65 ₹18,673.95 |
| 4.00 | Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete. | 1.27 | Cum | 364 ₹23,769.2 Lowest | 365 ₹23,834.5 |
| 5.00 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm center to center etc., | 2.43 | Sqm | 7,010 ₹52,434.8 Lowest | 7,010.22 ₹52,436.45 |
| 6.00 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete | 0.25 | Cum | 3,170 ₹60,388.5 Lowest | 3,170.79 ₹60,403.55 |
| 7.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 0.03 | Mt | 789 ₹1,00,203 Lowest | 789.1 ₹1,00,215.7 |
| 8.00 | Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work | 1.44 | Sqm | 46,146.85 ₹46,146.85 Lowest | 46,165.35 ₹46,165.35 |
| 9.00 | Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete | 15.35 | Sqm | - | - |
| 10.00 | Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site etc | 1.24 | Sqm | - | - |
Tender Value
₹3.1 L
EMD Value
₹3,060
Closing Date
18 Nov 2025, 3:00 pmClosed
BDO
PT OFFICE VICHOOR
Providing Paver block road Vichoor Murugesan House Opposite Kalidass House to Manmatha Sami Kovil in Vichoor Panchayat
2025_RDTN_623072_1
Pt Fund No-01 Work Of Faver Block In Vichur Panchayat
Open Tender
Civil Works - Roads
Works
180 days
VICHOOR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,060
Yes
27 Dec 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
Amount
Construction of Anganwadi Toilet at Semmanampottal in Nerkuppai Panchayat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm center to center etc.,
R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site etc
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete etc
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M. HAPEEP RAHMAN (BID ID -1513981)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_745046.xls
BOQ • 0.24 MB
TECHBIT.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .