Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹30.8 L+₹35,073.46 (1.15%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹31.4 L
EMD Value
₹32,000
Closing Date
22 Jul 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT -SFC MI Tanks and Ponds 2019-20- Shoolagiri Block Block -3 Works- Package No TN-04-KRI-104
2020_RDTN_171052_1
Roc_No_5732_2020_R4_15_06_20
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹32,000
DRDA Krishnagiri
27 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
22 Jul 2020
11 Jul 2020
13 Jul 2020
Amount
1.Rejuvenation of Minor Irrigation Tank of Thimmegoundan Eri H/O: Nerigam
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Name board arrangements
Provision for Boundry Stone
Construction of Weir
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Above Ground Level
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Reconstruction of Sluice
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Dismantling with out damaging the near by structures if any,clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortor wall under 3m high as directed by the engineer in charge of the two.
Dismantling with out damaging the near by structures if any,clearing away PCC as directed by the Engineer in charge of the works as per technical specification
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying,Hoisting,Laying and Fixing in Posistion of RCC Hume Pipe NP3 Class with Suitable Collars for Sluices including labour and jointing materials as directed by the departmental officers..600mm NP3
Providing Cut stone Fully dressed and set in CM1:3 including fixing in position etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying And Fixing Of Plug Rod Arrangements including Cost And Conveyance of All Charges Etc.. Complete..
ReFilling in Basement with excavated Earth in layers Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
2.Rejuvenation of Minor Irrigation Tank of Malakalakki Eri H/O Chinnarandoddi
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Name board arrangements
Provision for Boundry Stone
Construction of Weir
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Above Ground Level
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Reconstruction of Sluice
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Dismantling with out damaging the near by structures if any,clearing away and carefully stacking materials useful for reuse for any thickness of wall in brick masonry in cement mortor wall under 3m high as directed by the engineer in charge of the two.
Dismantling with out damaging the near by structures if any,clearing away PCC as directed by the Engineer in charge of the works as per technical specification
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying,Hoisting,Laying and Fixing in Posistion of RCC Hume Pipe NP3 Class with Suitable Collars for Sluices including labour and jointing materials as directed by the departmental officers..600mm NP3
Providing Cut stone Fully dressed and set in CM1:3 including fixing in position etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying And Fixing Of Plug Rod Arrangements including Cost And Conveyance of All Charges Etc.. Complete..
ReFilling in Basement with excavated Earth in layers Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
3.Rejuvenation of Minor Irrigation Tank of Muthukurukki Eri H/O Pannapalli.
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Name board arrangements
Provision for Boundry Stone
Construction of Weir
Earth work open excavation in all soils and sub soils to full depth as may be directed except hard rock requiring, blasting, but inclusive of shoring strutting and bailing out water were ever Necessary Etc Complete compling with standard specifications and as directed by the departmental officers
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Above Ground Level
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SUBARAMANIAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .