| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.2 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹51.9 Cr+₹71.2 L (1.39%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | BALAJIKRUPA PROJECTS PRIVATE LIMITED L1 | Ganapathi Stone Crushers Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.including all labour, usage charges of all machinery etc., complete. (for new roads) 2 .ii)By mechanical means A)in area of light jungle. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 4.32 | Ha | 30,000 ₹1,29,600 Lowest | 34,670.05 ₹1,49,775 |
| 2.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately. including all labour, usage charges of all machinery etc., complete. (Dismantled material to be transported mechanically) with all lead and lifts and as per the directions of Engineer-in-charge of work. | 10,543.25 | Cum | 250 ₹26,35,813 Lowest | 526.75 ₹55,53,657 |
| 3.00 | Excavation for roadwork in soil by hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location, with all lifts and lead upto 1000 m, including all labour, usage charges of all machinery etc., complete. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 1,06,193.87 | Cum | 50 ₹53,09,694 Lowest | 111.51 ₹1,18,41,678 |
| 4.00 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for subgrade construction including all lead, lifts, loading, unloading, all labour, usage charges of all machinery etc., complete. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 18,033.75 | Cum | 50 ₹9,01,688 Lowest | 98.77 ₹17,81,193 |
| 5.00 | Construction of embankment with approved material obtained from borrow pits laid in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross section including watering, consolidation by roller to the desired field density not less than 95% of maximum dry density including all lead, lifts, loading, unloading, all labour, usage charges of all machinery etc., complete with all lead and lifts and as per the directions of Engineer-in-charge of work. | 6,687.5 | Cum | 100 ₹6,68,750 Lowest | 501.26 ₹33,52,176 |
| 6.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete. (New road formation) with all lead and lifts and as per the directions of Engineer-in-charge of work. | 52,107.08 | Cum | 100 ₹52,10,708 Lowest | 504.45 ₹2,62,85,417 |
| 7.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete with all lead and lifts and as per the directions of Engineer-in-charge of work. | 25,783.24 | Cum | 3,200 ₹8,25,06,368 | 2,578.96 ₹6,64,93,945 Lowest |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, with all lead and lifts and as per the directions of Engineer-in-charge of work. | 16,695 | Cum | 3,200 ₹5,34,24,000 | 2,671.35 ₹4,45,98,188 Lowest |
| 9.00 | Providing and applying primer coat with SS1 bitumen emulsion complying IS-8887 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per table-500-3, including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete,over WMM/WBM surface. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 65,380 | Sqm | 30 ₹19,61,400 Lowest | 68.98 ₹45,09,912 |
| 10.00 | Providing and applying tack coat with bitumen emulsion(RS1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete, (A) On Granular surfaces treated with primer. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 80,230 | Sqm | 13 ₹10,42,990 Lowest | 14.78 ₹11,85,799 |
Tender Value
₹48.8 Cr
EMD Value
₹48.8 L
Closing Date
4 Nov 2024, 4:00 pmClosed
Executive Engineer NH Dn Hubballi
Office of the Executive Engineer NH Dn Hubballi
Improvements road from Dharwad cross (near Dastikoppa ) to Dharwad (near Nuggikeri ) for a length of 28 Kms SH-1 connecting NH-63 and NH-48 in Kalaghatagi/ Dharwad taluka Dharwad ( Job No CRIF-KNT-2023-24-295)
2024_MoRTH_828904_1
EE/HBL/IFT/CRIF/24/25/1238/02 Dt01/10/2024
Open Tender
Civil Works - Roads
Item Rate
335 days
Dastikoppa
As per Tender Doc
3 documents required · 3 mandatory
₹29,500
Executive Engineer NH Dn Hubballi
₹48.8 L
Executive Engineer NH Dn Hubballi
6 Jan 2025
3 Oct 2024
5 Nov 2024
3 Oct 2024
4 Nov 2024
3 Oct 2024
9 Oct 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.including all labour, usage charges of all machinery etc., complete. (for new roads) 2 .ii)By mechanical means A)in area of light jungle. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 4.32 | Ha | 32,646 | ₹1,41,030.72 |
| - | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately. including all labour, usage charges of all machinery etc., complete. (Dismantled material to be transported mechanically) with all lead and lifts and as per the directions of Engineer-in-charge of work. | 10,543.25 | Cum | 496 | ₹52,29,452 |
| - | Excavation for roadwork in soil by hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location, with all lifts and lead upto 1000 m, including all labour, usage charges of all machinery etc., complete. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 1,06,193.87 | Cum | 105 | ₹1,11,50,356.35 |
| - | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for subgrade construction including all lead, lifts, loading, unloading, all labour, usage charges of all machinery etc., complete. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 18,033.75 | Cum | 93 | ₹16,77,138.75 |
| - | Construction of embankment with approved material obtained from borrow pits laid in layers not exceeding 250 mm loose thickness, spreading, breaking clods, removal of roots and other organic materials to the required line, grade and cross section including watering, consolidation by roller to the desired field density not less than 95% of maximum dry density including all lead, lifts, loading, unloading, all labour, usage charges of all machinery etc., complete with all lead and lifts and as per the directions of Engineer-in-charge of work. | 6,687.5 | Cum | 472 | ₹31,56,500 |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete. (New road formation) with all lead and lifts and as per the directions of Engineer-in-charge of work. | 52,107.08 | Cum | 475 | ₹2,47,50,863 |
| - | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete with all lead and lifts and as per the directions of Engineer-in-charge of work. | 25,783.24 | Cum | 2,428.4 | ₹6,26,12,020.02 |
| - | Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, with all lead and lifts and as per the directions of Engineer-in-charge of work. | 16,695 | Cum | 2,515.04 | ₹4,19,88,592.8 |
| - | Providing and applying primer coat with SS1 bitumen emulsion complying IS-8887 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per table-500-3, including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete,over WMM/WBM surface. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 65,380 | Sqm | 64.95 | ₹42,46,431 |
| - | Providing and applying tack coat with bitumen emulsion(RS1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom & dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading & unloading etc., complete, (A) On Granular surfaces treated with primer. with all lead and lifts and as per the directions of Engineer-in-charge of work. | 80,230 | Sqm | 13.92 | ₹11,16,801.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_871015.xls
BOQ • 0.34 MB
KW4295.pdf
Tender Documents • 0.98 MB
GeneralConditions.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .