Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹68.1 L+₹6.7 L (11.0%)Rejected-Finance | L2 | Rejected-Finance prices are high hence rejected | |
| 3 | L3₹75.6 L+₹14.2 L (23.1%)Rejected-Finance | L3 | Rejected-Finance prices are high hence rejected |
Tender Value
₹78 L
EMD Value
₹1.6 L
Closing Date
26 Nov 2020, 4:00 pmClosed
Executive Engineer Electric Division II Jammu
Office of The Executive Engineer Electric Division II JPDCL Gandhi Nagar Jammu
SITC of 1250 KVA Distribution Substation HT AVR alongwith 11KV line on 9 Mtr PCC Poles with 120mm sq ABCable alongwith Isolation point for Musical Water Fountain at Baghe Bahu
2020_PDD_109118_1
enit No. 79 of 2020-21 dated 12-11-2020
Open Tender
Electrical Works
Turn-key
30 days
Baghe Bahu
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer Electric Division II Jammu
₹1.6 L
7 Jan 2021
13 Nov 2020
27 Nov 2020
13 Nov 2020
26 Nov 2020
13 Nov 2020
13 Nov 2020 - 19 Nov 2020
Amount
Supply, Transportation, installation Testing Commissioning of 11/0.415KV 1250KVA Built-in HT Automatic Voltage Regulator
Supply, Transportation, installation Testing Commissioning of 11/0.415KV 1250KVA (Level: 2, "BIS Marked" Copper Wound) HT Automatic Voltage Regulator, Oil Immersed, Cooling- ONAN , Mode of operations- Manual & Automatic , Outdoor Type, 1250KVA, Input- 8000V to 12000Volts, 3Phase, 50Hz suitable for balanced Load, Output-415Volts 3Phase, 50Hz suitable for balanced Load, Input Current at 8KV- 90.21Amps, Input Current at 12KV- 60.14Amps, Output Current at 0.415KV-1739.05Amps, Terminal-HT Input-Cable Box and LT Output-Cable Box for termination of 4x400 Sq.mm 4Core Cables (Complete cable termination/phase)
Supply, Transportation, Erection of 11 Mtr Long ST Pole (ST-410 SP56) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO AB Switch, 3-phase, 3-pole, 400 Amp.
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Set
Supply, Installation, Testing & Commissioning of 11 KV LA Set 9 KV, 10 KA with Polymer/Porcelain housing, Stn Type
Providing & Fixing of XLPE Armoured Cable 400 mm² 4 Core alongwith 40 Nos Al. Thimble of 400 mm² and Kits of appropriate Size for proper termination (11 Mtrs 400 mm² 4 Core Cable for each Phase Between Transformer and LT Output-Cable Box & 1 spare length of 11Mtrs of 400mm² 4 Core )
Supplying, testing, commissioning and installation of LT Outdoor type Distribution Box Cubical fabricated out of 3.15 MM thick CRC sheet & powder coated and paint fitted with indicated lamp to show By-pass & Servo ON indication. Also fitted with 1 No 2000Amp (ACB) three pole microprocessor Based release with suitable arrangement to connect 400mmsq 4 Core Cables per phase .Bus Bar should be of 2500 TPN
Construction of PCC Platform (10x12x6) & 3feet below ground level ) for 1250 KVA SubStation (Approx. 21.74Cum).
Providing of Earthing of Sub-Station - Excavation of Earth Pit, Installation of Earth Pipe of 40 mm of nominal bore & length 2.5 Mtr, GI Strip for neutral Earthing of Size 75 mm x 10 mm & 50 mm x 6 mm for connection of Transformer Body, GO Set, LA Set (Complete Job)
Providing & Fixing of 11 KV Pin Insulator with Pins (Polymer/Porcelain) 10 KN
Providing & Fixing of 11 KV Disc Insulator with Fittings (Polymer/Porcelain) 45 KN
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing of Cement Bottoming (1:2:4) as per REC Standards 0.6Cum/Pole of 11 Mtrs ST Pole
Supply erection testing & commissioning of 11 KV CT/PTunit having ratio 75/5 along with Trivector meter(complete Unit)
Supply and installation of Chain link Fencing of 11/0.415 kV Yard of Substation by way of Mass Concrete in Foundations and chainlink fencing of 6 ft height with access door facility including Painting with aluminum paint of approved brand and Manufacture to give an even shade.
Supply , installation, Testing & commissioning of 11 kV 3- Core 185 mm² armoured, FRLS fitted with proper 11KV 185mm² termination kits at both ends including properly punched aluminium thimbles of appropriate sizes.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
Providing & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Particulars of works for erection of 11KV line with 120 mm² HT ABC on 9 mtrs PCC poles
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply Installation, testing & Commissioning of 120 mm² AB (HT) Cable (3x120 + 1x95 mm² bare messanger) cable
Providing & fixing of Heat Shrinkable Outdoor Cable Termination Kit
Providing & fixing of Suspension/Tension Clamp with eye hook
Providing , fixing & tightening of Galvinized Nuts and Bolts.
Providing & fixing of Danger Plates
Providing & fixing of Anti-Climbing Device with Clamps
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr(Complete)
Providing of Stone Pad 300 mmx300mmx75mm
Mid Span Straight Through Jointing Kit for 11KV ABC
Providing & erection of Galvanised stay set with 50x8mm stay clamp, guy insulators (2 Nos), anchor plate (200x200x6mm), Nuts Bolts, 2 Nos turn buckles, 1.8 mtr long, 16 mm dia meter solid GS stay rod & 7/3.15 dia GI standard wire complete
Particulars of works for erection & commissioning of Tapping/Isolation point
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300Kg) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Laying & Stringing of ACSR Weasel Conductor on Cross arms through insulators including proper binding & twisting with soft Aluminium Wire
Supply, Installation, Testing & Commissioning of 11 KV GO AB Switch, 3-phase, 3-pole, 400 Amp.
Providing & Fixing of 11 KV Pin Insulator with Pins (Polymer/Porcelain) 10 KN
Providing & Fixing of 11 KV Disc Insulator with Fittings (Polymer/Porcelain) 45 KN
Providing & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Providing of Stone Pad 300 mmx300mmx75mm
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing , fixing & tightening of Galvinized Nuts and Bolts.
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
Particulars of works for Supply, Underground installation & commissioning of 0.550 Km 400mm² 4 Core LT underground cable
Supply, underground installation, testing & commissioning of 400mm² 4 Core Cable,1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type(3-ɸ, 1N) (5 lengths of 110 Mtrs of 400mm² 4 Core Cable , one individual length/phase and One Spare Cable). Underground installation of XLPE Cables includes installation of Route marker, Warning Tap, Excavation in any type of soil including hard laterite soil (1m x 1m x 100m=100Cum), Back filling of available excavated earth (89 Cum), Sand for cushioning of HT underground cables (6 Cum), RCC protective cover of size 300 mm (width) x 300mm (Length) x 60 mm (Thickness) for underground cables.
Cable Termination Kits (indoor/outdoor)
Brick Masonary Chamber 900x900x1050mm with RCC top slab, Cast Iron cover in CI Frame (38Kg)
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
M/S APR CONSTRUCTIONS
Pir Panchal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .