Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC | 1 | Accepted-AOC lowest | |
| 2 | 2₹5.7 L+₹40,126 (7.56%)Rejected-AOC | 2 | Rejected-AOC second lowest | |
| 3 | 3₹5.8 L+₹46,892 (8.83%)Rejected-AOC | 3 | Rejected-AOC third lowest | |
| 4 | 4₹5.8 L+₹48,761 (9.19%)Rejected-AOC | 4 | Rejected-AOC fourth lowest | |
| 5 | 5₹5.9 L+₹55,799 (10.5%)Rejected-AOC | 5 | Rejected-AOC fifth lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
12 Oct 2020, 11:00 amClosed
Sr Xen Civil Mtc P and M Division Patiala
Flat no 29 shakti vihar patiala
Providing and construction of RCC retaining wall for protection of tower no 56 of 220 kvBhalwanChhajli line circuit 1 and 2
2020_POWER_54402_1
172/2020-21
Open Tender
Civil Works
Item Rate
120 days
Patiala
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹20,000
Yes
21 Oct 2020
7 Oct 2020
12 Oct 2020
7 Oct 2020
12 Oct 2020
7 Oct 2020
Amount
CSR and NS ITEMS
Earth work in excavation in fdns,trenches etc in all kinds of soil where pick jumper work is not involved & not exceeding2.00 mtr depth i/c dressing of bottom & sides stacking the excavated soil clear from the edge.(6.6)
Earth filling under floors with surplus soil containing gravel or kankar up to 40 % excavatd from foundations & taken only from out side the building plinth in 15 Cm layer i/c ramming , watring & consolodating up to lead of 30 Mtrs (6.8 A I)
Centring & shuttering in foundations (9.1)
Centring & shuttering for columnsCentring and shuttering for faces of walls, partitions, retaining walls and the like (vertical or bartering including attached pillasters buttersses etc Centring and shuttering for faces of (9.2)
CC 1:8:16 with 40mm gauge stone aggregate (10.6 B)
CC 1:6:12 with 40mm gauge stone aggregate (10.7 B II)
Conglomerate floor 50 mm thick cement concrete topping 1:2:4.(14.7)
RCC M-20 machine mixed and vibrated excluidiing steel reinforcment & shuttering in foundation & plinth 10.15
RCC M-20 machine mixed and vibrated excluidiing steel reinforcment & shuttering in superstr. 10.21
Cold steel twisted bar bending & binding complete in all respect as per Note XIV of chapter 10 (18.18)
Loading and Unloading of Stone metal, c.sand, fine sand and aggreagtes on main raod 4.1 A
Carriage of material from mai road to tower site through Kachha path 5.2 I
Extra carriage for Cement AOR
Extra carriag for Fine sand AOR
Extra carriag for Coarse aggregates AOR
Extra carriag for Coarse sand AOR
Difference of quarry rates
crusher 10/11.2 mm AOR
crusher 12/13.2 mm AOR
Stone ballast 40 mm AOR
Course sand AOR
Notes: -
The rates for items above are through rates exclusive the cost of Cement & Steel . That shall be issued by the PSTCL free of cost from Ablowal/Jamsher store.
For all the above items ref. to CSR or NS items is given in short and complete nomenclature of CSR as well as NS items originally approved by CE/ TS, PSTCL, Patiala or CE/P&M, PSTCL, Ludhiana will be applicable along with general specifications.
For any NS item, which is not covered in the DNIT, shall be allowed on the same pattern of AOR with the prior approval of Er-in Charge.
GST will be applicable as per Govt. norms.
BHARPUR SINGH
THE LADDA SEHKARI KIRAT AND USARI SABHA LIMITED
CHANDAN ENTERPRISES
NEO ENERGY SOLUTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .