Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical 18 19 MUNESWAR PURAM PARA ALAMNAGAR BIHIND ROSE CHILDREN ACADEMIC LUCKNOW UTTAR PRADESH 226017 | LUCKNOW | UTTAR PRADESH | 226017 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
9 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Shahjahanpur
Electy. Trans. Circle Shahjahanpur
Work
2024_UPTCL_920602_1
Short Term E.Tender no. 53ETCS(S)/2023-24
Open Tender
Electrical Works
Fixed-rate
90 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹27,000
23 Jul 2024
28 Mar 2024
10 Apr 2024
28 Mar 2024
9 Apr 2024
28 Mar 2024
28 Mar 2024 - 9 Apr 2024
Amount
Complete drain out of transformer oil from 40 MVA T/F into empty oil drum/storage tank.
Replacement of all gaskets including the top of T/F by providing and fixing new gaskets as per existing size made of rubberised cork sheet made of kotika/turboze/Nu cork brand grade 07
Overhauling the diverter switch and bucholz relay after removing transformer oil and dirty Transformer oil from its chamber .Filling the fresh centrifused transformer oil.Checking proper operation of bucholz relay.
Cleaning of core and winding by fresh transformer oil and remove the sludge from bottom
Painting of Transformer after removal of rust/ dust then painting them with one coat of Red oxide then two coat with smooth gray of ISI mark paint.
Carriage of 10 number fresh transformer oil from 220 KV S/S Hardoi to 132 kv S/S Shrimau distance approx -50 Kms (approx). Loading of 10 number filled oil drums at 220kv s/s hardoi and unloading the same at 132kv s/s Shrimau store to complete the job satisfactory.
Complete erection of 132/33 KV 40 MVA T/F .The erection of radiator, conservator tank, all bushings, turrets, Bucholz relay, connecting pipe lines, cooling fans, motor drive mechanism of tap changer jumpering of HV & LV side etc.Filling & topping up of the T/F oil in tank, radiator, all pipe lines, conservator tank etc. and attending the oil leakages if any and all other associated works for satisfactory completion of work. All T & P shall be provided.
Filling of transformer oil in to main tank and Centrifuging of oil in main transformer tank un-interrupted till the desired BDV valve of the oil is achieved including recording all the parameters hourly such as temperature, vacuum, material, centrifuging machine and T & P.
Jumpering of the 40 MVA T/F.
HV side with single ACSR panther conductor.
LV side with ACSR Double panther conductor.
Termination of 40 MVA, 132/33 KV T/F Bay control cables in control & relay panel as per cable schedule including making necessary holes in the glands plates or box wherever required, the job satisfactorily as per technical specification.
Erection & installation of RTCC panel of 40 MVA T/F along with shifting from storage place to Control room including termination & connection of control cables at RTCC panel side & transformer side as per technical specification.
Delta earthing consisting of fabrication of 03 Nos. 03 Meter long electrod (40mm dia MS bar) its placing 70mm below ground level and connection of all 03 electrod with 75x10 mm MS Flat and connecing the same with main earthmat at 02 places earthing of T/F nutural with flat and angels.
Earthing of Main Tank, marshelling box, Drive mechanism, Transformer neutral etc of 40MVA Transformer, 3No of 145Kv CT, 3No of 36KV CTs along with their JB and 3no of 120KV LAs & 33 KV LAs with 75x10 mm, 50x6mm and 25x6mm MS Flat strips which includes providing, cutting,welding, strengthening and bending of MS flat and shifting of all other associated material from store to work site:-
25x6mm. MS Flat
50x6mm. MS Flat
75x10mm. MS Flat
Painting of newly erected MS Flat following with 01 coat red oxide and 02 coat with bus green ISI mark paint complete with its MS Flat & vertical support.
25x6mm. MS Flat
50x6mm. MS Flat
75x10mm. MS Flat
Special delta earthing of LA by making mesh and connection with existing earthmat for 132 KV T/F bay.
Special delta earthing of LA by making mesh and connection with existing earthmat for 33 KV T/F bay.
Pre commissioning test of 40 MVA 132/33Kv Transformer in which following tests are to be conducted:- i)SFRA ii)Tan Delta Capacitance measurement of windings iii)Tan Delta capacitance measurement of bushings iv)Winding resistance measurement v)Voltage Ratio Test vi)Magnetizing Current test vii)Magnetic Balance Test viii)Insulation resistance Test & PI Test ix)Short Circuit Test
Repairing the T/F Marshalling Box after removing the rust using rage mall. Painting the marshalling box using 2 coat primer and 2 coat grey paint of standard make(berger/asian) . Replacing old and damaged TB switches, fuses,auxiliary contactors,power contactor,TDR relay,overload relay ,3 phase MCB,switches etc as per requirement and again rewiring all connections to make all fans working on auto and manual mode.Rewiring & termination from all mechanical relays (OLTC,bucholz,prv,osr,wti,oti, etc)on marshalling box TB.
Providing, fixing and rewiring all connections of 1 no. WTI and 1 no.OTI meters with sensor leads/probe for 40 MVA T/F BHEL make as per sample and making both meters functional.
Erection of meter cubicle along with grouting and earthing using 25x6mm MS flat.Retrofiiting and commisionning of 2 no. ABT meters and complete termination of cable using suitable sizes of cable gland at both ends.
Obtaining No Objection Certificate from office of Electrical safety Directorate, Lucknow for first time energisation of 40 MVA 132/33KV Transformer (including payment of fee as per challan.)
Supply of 132KV bushing clamp made of LM6 aluminium alloy for panther conductor with GI nuts and bolt and spring/plain washer. As per sample.
Supply of 33KV bushing clamp made of LM6 aluminium alloy for twin panther conductor with GI nuts and bolt and spring/plain washer. As per sample.
Termination of 132 KV New APJPL Bay, control cables in control & relay panel as per cable schedule including making necessary holes in the glands plates or box wherever required, the job satisfactorily as per technical specification.
Special delta earthing of LA by making mesh and connection with existing earthmat for 132 KV APJPL bay.
Laying of earthmat in extension portion of switchyard after digged of 0.5 meter deep trench in earth and laying of MS round bar 40 mm dia in digged trench will all other associated works (with excavation )
Preparing of MS electrode 3 meter long in conical shape at one end and driving them in earth as per drawing
Making lap joint in 36/40 mm dia ms round bar and painting then in black bituminous paint.
Making cross joint with ms round bar 40mm dia with painting of each joint with black bituminous paint.
Making end joint with ms round bar 40mm dia with painting of each joint with black bituminous paint.
Erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structures required for installation of Bays ALP/ABL/BBL/BCT’s etc. including shifting of all material i.e. structure parts nuts, bolts washer etc. from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
Stringing of 132 KV Jack Bus for 40 MVA T/F of ACSR Panther conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section=24 Mtr.)
Stringing of 132 KV New Apjpl bay from dead end tower to main bus of ACSR Panther conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(3 Section=105 Mtr.)
Stringing of 132 kv main bus bar 3 phase with moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section=12Mtr.)
Stringing of 132 kv Transfer bus bar 3 phase with moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor and also shifting of all materials from store site.(1 Section=12Mtr.)
Stringing of 33 kv main bus bar 3 phase with moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor ,jumpering work all 33 kv feeders and also shifting of all materials from store site.(1 Section=40 meter)
Stringing of 33 kv Transfer bus bar 3 phase with moose conductor including fitting of tension clamp, hoisting of Disc Insulator, cutting of conductor ,jumpering work all 33 kv feeders and also shifting of all materials from store site.(1 Section= 40 meter.)
Erection of Equipments :- Erection of following equipments as per instruction manual of various equipment and technical specification including earthing of equipments, shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily :-
0.4 KVA Station Work
145 KV C.T. with JB
120 KV LAs.
145 KV Bus Isolator.
145 KV Line Isolator.
145 KV Tendom Isolator.
145 KV Post Isolator.
132 KV Control &Relay Panel
33 KV Fuse set
Laying of following sizes of control cable in the cable trench from control relay panel to various equipment/marshalling boxes/JB etc. in switchyard as per cable schedule, its saddling at every 75mm. distance with MS saddles of size 25x3mm. including carriage of cable drum from store to laying site & shifting back to store and all other associated works to complete the job satisfactorily as per technical specification.
Dismentling of cable / termination of CB, LI, BI, and TI from control and relay panel of existing APJPL bay from respective trench and again laying to the new bay location including proper dressing & cleaning etc. and shifting of all other associated material fromsite to work site. & shifting back to store and all other associated works to complete the job satisfactorily as per technical specification.
Carriage of sub-station structure through private truck from EFU Naini (Allahabad) to above sub-stations alongwith sorting, shifting and loading at Naini and unloading and stacking at 132kv s/s sandila,for construction of 132 KV bay at132kv s/s shrimau
Sorting out and stacking of main & auxilary structure as per BOM at EFU Naini (Allahabad)
Loading of structure on Pvt. Truck / trailer at EFU Naini.
Transportation of structure from EFU Naini, Allahabad to different sub-stations
Unloading and proper stacking of structure parts at different Sub-stations
Dismentling of CT , PT, LA Isolator and PI from existing APJPL Bay and shifting to new location for proposed bay
132 KV CT/PT
120 KV LAs.
132 kv Line isolator (with earth switch)
33 kv isolator / 33 kv drop out fuse set
Dismantling of main and aux. Structure including their shifting from dismantling site to safe storage place at the sub station
Dstringing work of existing APJPL bay for making a new 40 MVA transformer bay and shifting of all dstringing conductor, insulator and fittings to open store (50 meter)
Dstringing work of existing 33 kv main and 33 KV transfer bus for extension work of main and transfer bus work includes opening of all 33 kv feeders jumper (01 section of main and transfer bus app-30 meter) and shifting of all dstringing conductor, insulator and fittings to open store
Dismentailing work of pilfer proofing of 132 kv APJPL Solar bay the works includes are as below:- Removing of trench covers , disconnecting of cable from 132 kv CT, PT, in switch yard and C&R panel and Apex meter cube in control room . Then carefully cutting the pipe without damaging the cable.
G.I. pipe 2" dia (dismentelling with cable)
G.I. pipe 1" dia (dismentelling with cable)
Pilfer proofing of the cable with GI pipe of following sizes complete bending & fixing of pipe alongwith making threads, elbow and oth. Required material from 132 kv CT and PT.
G.I. pipe 2" dia (Erection with old pipe)
G.I. pipe 2" dia (Erection with new pipe)
G.I. pipe 1" dia (Erection with old pipe)
G.I. pipe 1" dia (Erection with new pipe)
Supply, installation & commissioning of LED street light luminaries 120 watt Aluminum Die Cast (GST extra). Transportation upto site, insurance etc. and any other job requested to properly execute the complete work.
Providing and Fixing of Updated Single Line Diagram in PVC sheet of size 6x6 feet of complete 132/33KV switchyard of 132KV Sub-station Shrimau as per instruction by concerning JE/SDO.
Supply of sand buckets as per technical specification
Special earthing by way of boring & lowering of GI Pipe 50 mm dia 60 feet long from ground upto water level and it will be connected to the MS strip 50x6mm including providing, laying of MS strip with cutting welding bending etc. for 36 KV VCB’s & 36 KV CT’s & also T/F neutral point etc. of different bays at 132 KV Sub-station, Shrimau. The earth strip will be welded to the GI Pipe. The work also includes cap & clamps for pouring water. All the materials, labour and T&P shall be supplied by the firm.
Supply of Bolted type single tension fitting suitable for panther conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per sample.
Supply of single tension fitting suitable for panther conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per sample.
Supply of Bolted type single tension fitting suitable for Moose conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per sample.
Supply of single suspension fitting suitable for panther conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per sample.
Supply of single suspension fitting suitable for moose conductor with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer. As per sample.
Supply of PG clamp duly made of LM6 aluminium alloy suitable for panther-panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
Supply of PG clamp duly made of LM6 aluminium alloy suitable for moose-panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
Supply of PG clamp duly made of LM6 aluminium alloy suitable for moose-moose complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer. As per sample.
Supply of Post insulator clamp for panther duly made of LM6 aluminium alloy with GI nuts and bolt and spring/plain washer. As per sample.
Supply of Post insulator clamp for moose duly made of LM6 aluminium alloy with GI nuts and bolt and spring/plain washer. As per sample.
Supply of earthing materials as per details.
40mm MS Rod for Main Earthmat
40mm dia MS Electrodes (3 Meter Long)
MS Flat for earthing
Lan Cable
PVC Conduit Pipe-3/4
Optical fibre required for SAS as per Technical Specification
SATKAR TRADERS
M/s S.S. Refregeration
M/s Abhinav Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .