Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82.0 LAdmitted-Finance AJMER | RAJASTHAN | 305001 | -14.55% | ₹82.0 L | L1 | Admitted-Finance |
| 2 | L2₹83.6 L+₹1.6 L (1.92%)Admitted-Finance | -12.91% | ₹83.6 L+₹1.6 L (1.92%) | L2 | Admitted-Finance |
| 3 | L3₹87.8 L+₹5.8 L (7.02%)Admitted-Finance | -8.55% | ₹87.8 L+₹5.8 L (7.02%) | L3 | Admitted-Finance |
| 4 | L4₹87.8 L+₹5.8 L (7.06%)Admitted-Finance | -8.52% | ₹87.8 L+₹5.8 L (7.06%) | L4 | Admitted-Finance |
| 5 | L5₹88.3 L+₹6.3 L (7.68%)Admitted-Finance | -7.99% | ₹88.3 L+₹6.3 L (7.68%) | L5 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
17 Aug 2026, 6:00 pmClosed
Bhanwar Singh Bajdoliya
EXEN office Srikaranpur
Construction of Pucca water course GCP-II in Chak 3 FA
2026_CECAD_580974_1
04_2026-27
Open Tender
Civil Works
Percentage
Srikaranpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
XEN GANG OFD DIV-V CAD SRIKARANPUR/MD/RISL
₹2.3 L
Yes
18 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
17 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs | 9,200.43 | Cubic Meter | 75 | ₹6,90,032.25 |
| 1.02 | Dressing of earthwork for all types of earthwork new or repair work for all types of soil | 9,200.43 | Cubic Meter | 1.6 | ₹14,720.69 |
| 1.03 | Ramming of earthwork in layers by wooden iron rammers to obtain density from 1.55 to 1.60 in Ordinary soil | 9,200.43 | Cubic Meter | 10 | ₹92,004.3 |
| 1.04 | Watering, ramming & dressing of subgrade including removal of irregularities up to 15 cm depth | 6,104.22 | Square Meter | 9.5 | ₹57,990.09 |
| 1.05 | Brick masonary in foundation and plinth with brick designation 75 in Cement sand mortar 1:5 | 1,078.56 | Cubic Meter | 5,047 | ₹54,43,492.32 |
| 1.06 | Add extra For using brick class designation 100 instead of class designation 75 | 1,078.56 | Cubic Meter | 342 | ₹3,68,867.52 |
| 1.07 | Cement plaster with cement sand mortar (1:4) including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness. In 10 mm in one coat | 10,896.32 | Square Meter | 196 | ₹21,35,678.72 |
| 1.08 | Earthwork excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 200 mtrs | 759.59 | Cubic Meter | 75 | ₹56,969.25 |
| 1.09 | Providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40 mm nominal size in foundation plinth, excluding the cost of shuttering using 1 cement: 4 sand: 8 aggregate mix | 38.57 | Cubic Meter | 4,586 | ₹1,76,882.02 |
| 1.1 | Brick masonary in cement mortar (1:6) including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect | 84.37 | Cubic Meter | 4,947 | ₹4,17,378.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
nit04.pdf
Tender Documents • 1.00 MB
BOQ_1032432.xls
BOQ • 0.31 MB
04.pdf
PDF • 0.30 MB
DANS.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .