Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹4.1 L+₹29,109.39 (7.59%)Accepted-AOC | ₹4.1 L+₹29,109.39 (7.59%) | L2 | Accepted-AOC WON IN A TRANSPARENT LOTTERY AMONG 5 VALID BIDDER DATED 29.07.2026 |
| 2 | L1₹3.8 LRejected-Finance | ₹3.8 L | L1 | Rejected-Finance RATE JUSTFICATION IS NOT GIVEN WITH IN DUE TIME |
| 3 | L2₹4.1 L+₹29,109.39 (7.59%)Rejected-AOC | ₹4.1 L+₹29,109.39 (7.59%) | L2 | Rejected-AOC LOST IN LOTTERY |
| 4 | L2₹4.1 L+₹29,109.39 (7.59%)Rejected-AOC | ₹4.1 L+₹29,109.39 (7.59%) | L2 | Rejected-AOC LOST IN LOTTERY |
| 5 | L2₹4.1 L+₹29,109.39 (7.59%)Rejected-AOC AT GORUAL PO GORUAL PS BRAHMAGIRI DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | ₹4.1 L+₹29,109.39 (7.59%) | L2 | Rejected-AOC LOST IN LOTTERY |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
8 Jul 2026, 5:00 pmClosed
Deputy Director Geology
OFFICE OF THE DEPUTY DIRECTOR GEOLOGY GWD DIVISION BARIPADA AT/PO- TAKATPUR, BARIPADA, MAYURBHANJ-757003
Construction of 2(Two) nos of RRHS in Nilagiri Block of Baleshwar District under CHHATA Scheme for the FY 2026-27
2026_GWSI_133700_1
14/GWDBPD/CHHATA/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
NILAGIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹5,000
Yes
14 Aug 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance for cutting bushes cleaning the sites etc complete. | 800 | Sqm. | 2.86 | ₹2,288 |
| 2 | Drilling a perfectly vertical 150 mm dia bore hole in weathered rock formation from ground level | 60 | Mtr. | 650 | ₹39,000 |
| 3 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 52 | Mtr. | 1,063.2 | ₹55,286.4 |
| 4 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 10 | Mtr. | 1,074.7 | ₹10,747 |
| 5 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 0.6 | Mtr. | 1,673.7 | ₹1,004.22 |
| 6 | Earth work excavation in stony earth and gravel mixed with stone and boulder not exceeding on 0.014 cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods and max. 5 cm to 7 cm and lying in layer not exceed 0.3 mtr in depth as per Specification approved by the department. | 8.14 | Cum | 441.17 | ₹3,591.12 |
| 7 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC.a) 2nd depth - | 6.96 | Cum | 1,109.34 | ₹7,721.01 |
| 8 | Cutting the disintegrated rocks not requiring blasting to be removed by pick axes and craw bars and depositing materials within 50m and 1.5m initial lift including rough dressing as per direction of EIC.b) 3rd depth - | 0.24 | Cum | 1,490.36 | ₹357.69 |
| 9 | Filling the F & P with sand well watered and rammed etc complete | 1.67 | Cum | 800.63 | ₹1,337.05 |
| 10 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 0.32 | Cum | 6,619.44 | ₹2,118.22 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_598823.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
14GWDBPDCHHATA.pdf
Tender Documents • 2.95 MB
BOQ_598823.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .